STACK POR03 Hillsboro Campus
200 MW AI data center in Hillsboro, OR, United States: operational.
- Capacity: 200 MW
- Location: Hillsboro, OR, United States
- Developer: STACK Infrastructure
- Status: operational
STACK POR03 Hillsboro Campus is a 200 MW AI data center project located in Hillsboro, OR, United States, currently operational. It is being built by STACK Infrastructure. This project is one of thousands of data-center facilities tracked by Data Center Index across OR, United States, covering operational, under-construction, announced, and permitted sites.
Project description
STACK plans 200 MW across six buildings at its 55-acre POR03 campus. POR03A through C are 24 MW each, POR03D is 25 MW and POR03E/F is 96 MW. So far 72 MW is operational, with 25 MW near-term and 96 MW of expansion capacity.
Related data center projects
- STACK Stafford Technology Campus (STC), 1.1 GW, Stafford, VA, United States · under construction
- STACK Infrastructure NVA02, 420 MW, Manassas, VA, United States · operational
- STACK DFW02 Lancaster, 312 MW, Lancaster, TX, United States · under construction
- STACK PHX02 Central Phoenix, 250 MW, Phoenix, AZ, United States · announced
- STACK PHX01 Avondale, 225 MW, Avondale, AZ, United States · operational
- STACK Loudoun County Campus, 180 MW, Arcola, VA, United States · announced
- STACK Atlanta ATL02 (Lithia Springs), 160 MW, Lithia Springs, GA, United States · operational
- STACK Leesburg NVA06 (Compass Creek), 72 MW, Leesburg, VA, United States · operational
Frequently asked questions
- What is STACK POR03 Hillsboro Campus?
- STACK POR03 Hillsboro Campus is an AI data center project in Hillsboro, Oregon tracked by Data Center Index. Its status is operational, and it is still adding buildings.
- Where is STACK POR03 Hillsboro Campus?
- STACK POR03 Hillsboro Campus is in Hillsboro, Oregon. Every tracked Oregon campus, with counts and capacity, is at https://datacenterindex.ai/markets/oregon.
- How big is STACK POR03 Hillsboro Campus?
- Data Center Index tracks STACK POR03 Hillsboro Campus at 200 MW. 72 MW of that is live today. The developer or the press states that capacity, in a source dated October 17, 2026.
- Who is building STACK POR03 Hillsboro Campus?
- STACK Infrastructure is developing STACK POR03 Hillsboro Campus.
- When will STACK POR03 Hillsboro Campus come online?
- STACK POR03 Hillsboro Campus is already operating. The next building is expected to go live 2027-12.
Sources
- POR03 - Hillsboro | STACK Infrastructure (stackinfra.com · press · 2026-09-18)
- Data Center Dynamics (datacenterdynamics.com · press · 2026-09-20)
- Recent Land Purchase Will Increase STACK Infrastructure's Flagship Portland Campus to 200MW (stackinfra.com · press · 2022-07-20)
- POR03D Hillsboro brochure (stackinfra.com · press · 2025-07-23)