STACK Infrastructure

Data center developer and operator formed by IPI Partners in 2019 from T5 and Infomart assets, offering hyperscale campuses, build-to-suit and wholesale colocation. Blue Owl bought IPI's business in January 2025.

Projects

Frequently asked questions

How many data centers does STACK Infrastructure have?
Data Center Index tracks 15 data center campuses with STACK Infrastructure named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does STACK Infrastructure have?
3 GW across 15 tracked campuses, counting operating and pipeline sites together. Of the 10 STACK Infrastructure campuses with a capacity figure, 0 are filed, 9 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does STACK Infrastructure build data centers?
Tracked STACK Infrastructure campuses sit in 7 markets: VA (6), LA (3), AZ (2), CA (1), GA (1), OR (1), TX (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest STACK Infrastructure data center?
STACK Stafford Technology Campus (STC) in VA is the largest tracked STACK Infrastructure campus at 1.1 GW, currently under construction. The developer or the press states that capacity, in a source dated October 20, 2026.

Profile sources