STACK NVA01 (Sterling)
17 MW AI data center in Loudoun County, VA, United States: under construction.
- Capacity: 17 MW
- Location: Loudoun County, VA, United States
- Developer: STACK Infrastructure
- Status: under construction
STACK NVA01 (Sterling) is a 17 MW AI data center project located in Loudoun County, VA, United States, currently under construction. It is being built by STACK Infrastructure. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
DEQ permits STACK Infrastructure gen-sets at 22080 Pacific Boulevard, Sterling (SI NVA01 ABS, LLC; current permit 2025-08-21); STACK says new NVA01 capacity gets early access in Q3 2026 and is fully commissioned by Q4 2026.
Related data center projects
- STACK Stafford Technology Campus (STC), 1.1 GW, Stafford County, VA, United States · under construction
- STACK Infrastructure NVA02, 420 MW, Prince William County, VA, United States · operational
- STACK DFW02 Lancaster, 312 MW, Lancaster, TX, United States · under construction
- STACK PHX02 Central Phoenix, 250 MW, Phoenix, AZ, United States · announced
- STACK PHX01 Avondale, 225 MW, Avondale, AZ, United States · operational
- STACK POR03 Hillsboro Campus, 200 MW, Hillsboro, OR, United States · operational
- STACK Loudoun County Campus, 180 MW, Arcola, VA, United States · announced
- STACK Atlanta ATL02 (Lithia Springs), 160 MW, Lithia Springs, GA, United States · operational
Frequently asked questions
- What is STACK NVA01 (Sterling)?
- STACK NVA01 (Sterling) is an AI data center project in Loudoun County, Virginia tracked by Data Center Index. Its status is under construction.
- Where is STACK NVA01 (Sterling)?
- STACK NVA01 (Sterling) is in Loudoun County, Virginia. Every tracked Virginia campus, with counts and capacity, is at https://datacenterindex.ai/markets/virginia.
- How big is STACK NVA01 (Sterling)?
- Data Center Index tracks STACK NVA01 (Sterling) at 17 MW. The developer or the press states that capacity, in a source dated October 17, 2026.
- Who is building STACK NVA01 (Sterling)?
- STACK Infrastructure is developing STACK NVA01 (Sterling).
- When will STACK NVA01 (Sterling) come online?
- The next building at STACK NVA01 (Sterling) is expected online 2026-12. That date is the first building going live, not the full build-out.
Sources
- Virginia DEQ air permit, Reg. No. 74079 (deq.virginia.gov · public record · 2025-08-21)
- STACK Infrastructure (stackinfra.com · press · 2026-10-17)