STACK DFW02 Lancaster
220 MW AI data center in Lancaster, TX, United States — announced.
- Capacity: 220 MW
- Location: Lancaster, TX, United States
- Developer: STACK Infrastructure
- Status: announced
STACK DFW02 Lancaster is a 220 MW AI data center project located in Lancaster, TX, United States, currently announced. It is being built by STACK Infrastructure. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States — covering operational, under-construction, announced, and permitted sites.
Project description
220 MW, six-building, 1.5M sq ft campus on 100+ acres in Lancaster with dedicated Oncor substation; planned delivery mid-2026.
Related data center projects
- STACK PHX02 Central Phoenix — 250 MW, Phoenix, AZ, United States · announced
- STACK PHX01 Avondale — 225 MW, Avondale, AZ, United States · operational
- STACK POR03 Hillsboro Campus — 200 MW, Hillsboro, OR, United States · operational
- STACK SVY02 Santa Clara Campus — 48 MW, Santa Clara, CA, United States · operational
- AWS / STACK Bossier Parish Campus (Benton), Benton, LA, United States · under construction
- AWS / STACK Caddo Parish Campus (Stateline Road, Blanchard), Blanchard, LA, United States · under construction
- AWS / STACK Shreveport Campus (Resilient Technology Park), Shreveport, LA, United States · announced
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction