STACK DFW02 Lancaster
312 MW AI data center in Lancaster, TX, United States: under construction.
- Capacity: 312 MW
- Location: Lancaster, TX, United States
- Developer: STACK Infrastructure
- Status: under construction
STACK DFW02 Lancaster is a 312 MW AI data center project located in Lancaster, TX, United States, currently under construction. It is being built by STACK Infrastructure. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Lancaster's 220 MW campus is planned for delivery in mid-2026, with six buildings and 1.5M sq ft on 100+ acres. It has its own dedicated Oncor substation.
Related data center projects
- STACK Stafford Technology Campus (STC), 1.1 GW, Stafford, VA, United States · under construction
- STACK Infrastructure NVA02, 420 MW, Manassas, VA, United States · operational
- STACK PHX02 Central Phoenix, 250 MW, Phoenix, AZ, United States · announced
- STACK PHX01 Avondale, 225 MW, Avondale, AZ, United States · operational
- STACK POR03 Hillsboro Campus, 200 MW, Hillsboro, OR, United States · operational
- STACK Loudoun County Campus, 180 MW, Arcola, VA, United States · announced
- STACK Atlanta ATL02 (Lithia Springs), 160 MW, Lithia Springs, GA, United States · operational
- STACK Leesburg NVA06 (Compass Creek), 72 MW, Leesburg, VA, United States · operational
Frequently asked questions
- What is STACK DFW02 Lancaster?
- STACK DFW02 Lancaster is an AI data center project in Lancaster, Texas tracked by Data Center Index. Its status is under construction.
- Where is STACK DFW02 Lancaster?
- STACK DFW02 Lancaster is in Lancaster, Texas. Every tracked Texas campus, with counts and capacity, is at https://datacenterindex.ai/markets/texas.
- How big is STACK DFW02 Lancaster?
- Data Center Index tracks STACK DFW02 Lancaster at 312 MW. The developer or the press states that capacity, in a source dated April 27, 2026.
- Who is building STACK DFW02 Lancaster?
- STACK Infrastructure is developing STACK DFW02 Lancaster.
- When will STACK DFW02 Lancaster come online?
- The next building at STACK DFW02 Lancaster is expected online 2027-03. That date is the first building going live, not the full build-out.
Sources
- STACK Infrastructure Expands Texas Footprint with a New 220MW Flagship South Dallas Campus (stackinfra.com · press · 2024-04-29)
- Texas Department of Licensing and Regulation (TABS project registration) (tdlr.texas.gov · public record · 2026-01-30)
- TCEQ Permit Search: RN112300124 SI DFW02A (permit-search.tceq.texas.gov · public record · 2026-03-24)
- TDLR TABS project STACK - DFW02A-P2 (tdlr.texas.gov · public record · 2026-01-30)
- TABS2025010772: STACK - DFW02A (tdlr.texas.gov · public record · 2025-01-30)
- DFW02 Campus Brochure (stackinfra.com · press · 2026-04-27)
- Dallas Innovates (dallasinnovates.com · press · 2026-01-30)
- STACK Infrastructure (stackinfra.com · press · 2026-04-27)