STACK Atlanta ATL02 (Lithia Springs)
160 MW AI data center in Lithia Springs, GA, United States: operational.
Updated
- Capacity: 160 MW
- Location: Lithia Springs, GA, United States
- Developer: STACK Infrastructure
- Status: operational
STACK Atlanta ATL02 (Lithia Springs) is a 160 MW AI data center project located in Lithia Springs, GA, United States, currently operational. It was developed by STACK Infrastructure. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Georgia.
Project description
STACK's ATL02 campus in Lithia Springs spans 64 acres and offers 160 megawatts of capacity, per the company's own campus page. STACK first filed for the campus in October 2023 with two three-story buildings on Factory Shoals Road and has since filed for two further buildings.
Related data center projects
- STACK Infrastructure Berry Hill (Southern Virginia Megasite), 3 GW, Danville, VA, United States · announced
- STACK Stafford Technology Campus (STC), 1.1 GW, Stafford County, VA, United States · under construction
- STACK Infrastructure NVA02, 420 MW, Prince William County, VA, United States · operational
- STACK DFW02 Lancaster, 312 MW, Lancaster, TX, United States · under construction
- STACK PHX02 Central Phoenix, 250 MW, Phoenix, AZ, United States · announced
- STACK PHX01 Avondale, 225 MW, Avondale, AZ, United States · operational
- STACK POR03 Hillsboro Campus, 200 MW, Hillsboro, OR, United States · operational
- STACK Loudoun County Campus, 180 MW, Arcola, VA, United States · announced
Frequently asked questions
- What is STACK Atlanta ATL02 (Lithia Springs)?
- STACK Atlanta ATL02 (Lithia Springs) is an AI data center project in Lithia Springs, Georgia tracked by Data Center Index. Its status is operational.
- Where is STACK Atlanta ATL02 (Lithia Springs)?
- STACK Atlanta ATL02 (Lithia Springs) is in Lithia Springs, Georgia. Every tracked Georgia campus, with counts and capacity, is at https://datacenterindex.ai/markets/georgia.
- How big is STACK Atlanta ATL02 (Lithia Springs)?
- Data Center Index tracks STACK Atlanta ATL02 (Lithia Springs) at 160 MW. The developer or the press states that capacity, in a source dated September 25, 2026.
- Who is building STACK Atlanta ATL02 (Lithia Springs)?
- STACK Infrastructure is developing STACK Atlanta ATL02 (Lithia Springs).
Sources
- ATL02 - STACK Infrastructure (stackinfra.com · press · 2026-09-25)
- Bisnow (bisnow.com · press · 2026-10-07)