STACK Loudoun County Campus
180 MW AI data center in Arcola, VA, United States: announced.
Updated
- Capacity: 180 MW
- Location: Arcola, VA, United States
- Developer: STACK Infrastructure
- Status: announced
STACK Loudoun County Campus is a 180 MW AI data center project located in Arcola, VA, United States, currently announced. It is being built by STACK Infrastructure. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Virginia.
Project description
STACK's Loudoun County campus in Arcola is planned as two two story buildings delivering 180 MW on a 122 acre site near Dulles International Airport, in the greater Ashburn cluster.
Related data center projects
- STACK Infrastructure Berry Hill (Southern Virginia Megasite), 3 GW, Danville, VA, United States · announced
- STACK Stafford Technology Campus (STC), 1.1 GW, Stafford County, VA, United States · under construction
- STACK Infrastructure NVA02, 420 MW, Prince William County, VA, United States · operational
- STACK DFW02 Lancaster, 312 MW, Lancaster, TX, United States · under construction
- STACK PHX02 Central Phoenix, 250 MW, Phoenix, AZ, United States · announced
- STACK PHX01 Avondale, 225 MW, Avondale, AZ, United States · operational
- STACK POR03 Hillsboro Campus, 200 MW, Hillsboro, OR, United States · operational
- STACK Atlanta ATL02 (Lithia Springs), 160 MW, Lithia Springs, GA, United States · operational
Frequently asked questions
- What is STACK Loudoun County Campus?
- STACK Loudoun County Campus is an AI data center project in Arcola, Virginia tracked by Data Center Index. Its status is announced.
- Where is STACK Loudoun County Campus?
- STACK Loudoun County Campus is in Arcola, Virginia. Every tracked Virginia campus, with counts and capacity, is at https://datacenterindex.ai/markets/virginia.
- How big is STACK Loudoun County Campus?
- Data Center Index tracks STACK Loudoun County Campus at 180 MW. The developer or the press states that capacity, in a source dated October 17, 2026.
- Who is building STACK Loudoun County Campus?
- STACK Infrastructure is developing STACK Loudoun County Campus.
Sources
- STACK Infrastructure Expands Loudoun County Footprint with 144MW Hyperscale Campus (stackinfra.com · press · 2025-02-11)
- STACK Infrastructure (stackinfra.com · press · 2026-10-17)