STACK Infrastructure NVA02
487 MW AI data center in Manassas, VA, United States — operational.
- Capacity: 487 MW
- Location: Manassas, VA, United States
- Status: operational
- Estimated cost: $5.2B
STACK Infrastructure NVA02 is a 487 MW AI data center project located in Manassas, VA, United States, currently operational.. The estimated build cost is $5.2B. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Epoch 'Current power' = 118 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Related data center projects
- QTS Cedar Rapids — 1.6 GW, Fairfax, IA, United States · operational
- QTS Richmond — 921 MW, Sandston, VA, United States · operational
- Stream Phoenix — 267 MW, AZ, United States · operational
- Vantage TX1 — 179 MW, Goodyear, AZ, United States · under construction
- Nexus Hubbard Campus — 7.2 GW, Hubbard, OH, United States · under construction
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction
- Microsoft Fairwater Wisconsin — 3.3 GW, Mount Pleasant, WI, United States · operational
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced