STACK Infrastructure NVA02
420 MW AI data center in Manassas, VA, United States: operational.
- Capacity: 420 MW
- Location: Manassas, VA, United States
- Developer: STACK Infrastructure
- Status: operational
- Estimated cost: $3.2B
STACK Infrastructure NVA02 is a 420 MW AI data center project located in Manassas, VA, United States, currently operational. It is being built by STACK Infrastructure. The estimated build cost is $3.2B. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States, covering operational, under-construction, announced, and permitted sites.
Notes
Epoch 'Current power' = 85 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Related data center projects
- STACK Stafford Technology Campus (STC), 1 GW, Stafford, VA, United States · under construction
- STACK PHX02 Central Phoenix, 250 MW, Phoenix, AZ, United States · announced
- STACK PHX01 Avondale, 225 MW, Avondale, AZ, United States · operational
- STACK DFW02 Lancaster, 220 MW, Lancaster, TX, United States · under construction
- STACK POR03 Hillsboro Campus, 200 MW, Hillsboro, OR, United States · operational
- STACK Atlanta ATL02 (Lithia Springs), 160 MW, Lithia Springs, GA, United States · operational
- STACK Loudoun County Campus, 144 MW, Arcola, VA, United States · announced
- STACK Leesburg NVA06 (Compass Creek), 72 MW, Leesburg, VA, United States · operational
Frequently asked questions
- What is STACK Infrastructure NVA02?
- STACK Infrastructure NVA02 is an AI data center project in Manassas, Virginia tracked by Data Center Index. Its status is operational, and it is still adding buildings.
- Where is STACK Infrastructure NVA02?
- STACK Infrastructure NVA02 is in Manassas, Virginia. Every tracked Virginia campus, with counts and capacity, is at https://datacenterindex.ai/markets/virginia.
- How big is STACK Infrastructure NVA02?
- Data Center Index tracks STACK Infrastructure NVA02 at 420 MW, on an estimated $3.2B build. 85 MW of that is live today. The developer or the press states that capacity, in a source dated September 20, 2026.
- Who is building STACK Infrastructure NVA02?
- STACK Infrastructure is developing STACK Infrastructure NVA02.
- When will STACK Infrastructure NVA02 come online?
- STACK Infrastructure NVA02 is already operating. The next building is expected to go live January 1, 2028.
Sources
- Epoch AI Frontier Data Centers (epoch · aggregator · 2026-04-29)
- STACK Infrastructure (stackinfra.com · press · 2026-09-20)
- Data Center Dynamics (datacenterdynamics.com · press · 2026-09-20)