STACK Infrastructure NVA02

487 MW AI data center in Manassas, VA, United States — operational.

STACK Infrastructure NVA02 is a 487 MW AI data center project located in Manassas, VA, United States, currently operational.. The estimated build cost is $5.2B. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States — covering operational, under-construction, announced, and permitted sites.

Notes

Epoch 'Current power' = 118 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI