STACK Infrastructure NVA02
487 MW AI data center in Manassas, VA, United States — operational.
- Capacity: 487 MW
- Location: Manassas, VA, United States
- Status: operational
- Estimated cost: $3.2B
STACK Infrastructure NVA02 is a 487 MW AI data center project located in Manassas, VA, United States, currently operational.. The estimated build cost is $3.2B. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Epoch 'Current power' = 85 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Related data center projects
- QTS Cedar Rapids — 1.6 GW, Fairfax, IA, United States · operational
- QTS Richmond — 921 MW, Sandston, VA, United States · operational
- QTS Richmond 3 — 336 MW, Sandston, VA, United States · operational
- QTS Richmond 1 — 333 MW, Sandston, VA, United States · announced
- Stream Phoenix — 267 MW, AZ, United States · operational
- QTS Richmond 2 — 252 MW, Sandston, VA, United States · operational
- Vantage TX1 — 179 MW, San Antonio, TX, United States · under construction
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction