Google Bristow
335 MW AI data center in Bristow, VA, United States — operational.
- Capacity: 335 MW
- Location: Bristow, VA, United States
- Developer: Google
- Tenant: Google DeepMind
- Status: operational
- Estimated cost: $10.6B
Google Bristow is a 335 MW AI data center project located in Bristow, VA, United States, currently operational. It is being built by Google for tenant Google DeepMind. The estimated build cost is $10.6B. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Users: Google DeepMind; Epoch 'Current power' = 279 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Google Bristow
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Alphabet (GOOGL) — developer · hyperscaler
- Alphabet (GOOGL) — tenant · hyperscaler
Related data center projects
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced
- Goodnight — 1.3 GW, Claude, TX, United States · operational
- Google Fort Wayne — 1.0 GW, Fort Wayne, IN, United States · under construction
- EcoDataCenter 1 — 1.0 GW, Fort Wayne, IN, United States · under construction
- Gemini Cluster (Iowa) — 1.0 GW, Council Bluffs, IA, United States · operational
- Wilbarger Campus — 800 MW, Vernon, TX, United States · announced
- Google New Albany — 543 MW, New Albany, OH, United States · operational
- Google-Kairos Power AI Data Center Initiative — 500 MW, Oak Ridge, United States · announced