STACK PHX01 Avondale
225 MW AI data center in Avondale, AZ, United States — operational.
- Capacity: 225 MW
- Location: Avondale, AZ, United States
- Developer: STACK Infrastructure
- Status: operational
STACK PHX01 Avondale is a 225 MW AI data center project located in Avondale, AZ, United States, currently operational. It is being built by STACK Infrastructure. This project is one of thousands of data-center facilities tracked by Data Center Index across AZ, United States — covering operational, under-construction, announced, and permitted sites.
Project description
STACK's Phoenix page lists PHX01 in Avondale with 225 MW of critical capacity, part of 500 MW across two Phoenix campuses on 155 acres.
Related data center projects
- STACK PHX02 Central Phoenix — 250 MW, Phoenix, AZ, United States · announced
- STACK DFW02 Lancaster — 220 MW, Lancaster, TX, United States · announced
- STACK POR03 Hillsboro Campus — 200 MW, Hillsboro, OR, United States · operational
- STACK SVY02 Santa Clara Campus — 48 MW, Santa Clara, CA, United States · operational
- AWS / STACK Bossier Parish Campus (Benton), Benton, LA, United States · under construction
- AWS / STACK Caddo Parish Campus (Stateline Road, Blanchard), Blanchard, LA, United States · under construction
- AWS / STACK Shreveport Campus (Resilient Technology Park), Shreveport, LA, United States · announced
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction