- Operating: 13
- Operating and expanding: 5
- Under construction: 2
- Announced: 9
- Operating capacity: 2.4 GW
- Pipeline capacity: 4.4 GW
- Grid: APS / SRP
Arizona pairs data centers with chip fabs. Stream Phoenix (267 MW) and Google Mesa (237 MW) are operating, Microsoft has a $7.65B, 263 MW campus under construction in Goodyear, and the state also hosts Intel's $20B Fab 52 in Chandler and TSMC's $12B Fab 21 in Phoenix. APS and SRP supply the power.
Data Center Index tracks 24 named data center campuses in Arizona (large sites with a source, not every building): 13 operating, 2 under construction, and 9 announced or permitted. The pipeline adds up to 4.4 GW of planned capacity. The grid is operated by APS / SRP, which runs the interconnection queue. Below: every tracked project in Arizona, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Arizona
- Fab 52 (18A), Chandler · operational · developer: Intel · ~$20.0B
- Fab 21 Phase 1 (N4), Phoenix · operational · developer: TSMC · ~$12.0B
- Microsoft Goodyear — 263 MW, Goodyear · operational · developer: Microsoft · tenant: OpenAI · ~$7.7B
- Google Mesa — 237 MW · operational · developer: Google · ~$6.9B
- Stream Phoenix — 280 MW, Goodyear · operational · developer: Stream Data Centers · ~$2.4B
- Meta Mesa, Mesa · operational · developer: Meta · ~$1.0B
- EdgeCore Mesa — 450 MW, Mesa · operational · developer: EdgeCore Digital Infrastructure
- QTS Phoenix 2 — 280 MW, Phoenix · operational · developer: QTS Data Centers
- NTT Mesa (Elliot Road campus) — 240 MW, Mesa · operational · developer: NTT Global Data Centers
- STACK PHX01 Avondale — 225 MW, Avondale · operational · developer: STACK Infrastructure
- Vantage AZ1 Goodyear — 176 MW, Goodyear · operational · developer: Vantage Data Centers
- CyrusOne Chandler (PHX1-PHX8) — 169 MW, Chandler · operational · developer: CyrusOne
- Iron Mountain Phoenix Campus (AZP-1/AZP-2) — 89 MW, Phoenix · operational · developer: Iron Mountain
- Microsoft El Mirage, El Mirage · operational · developer: Microsoft
- Apple Mesa, Mesa · operational · developer: Apple
- Project Blue (Beale Infrastructure) — 286 MW, Tucson · under construction · developer: Beale Infrastructure
- Aligned Glendale (PHX-13 campus) — 72 MW, Glendale · under construction · developer: Aligned Data Centers
- QTS Phoenix 3 (Glendale C|303) — 750 MW, Glendale · announced · developer: QTS Data Centers
- STACK PHX02 Central Phoenix — 250 MW, Phoenix · announced · developer: STACK Infrastructure
- Amazon Laveen (Loop 202 & Dobbins Rd), Phoenix · announced · developer: Amazon Web Services
- Copia Power Pinal County (Maricopa), Maricopa · permitted · developer: Copia Power · ~$6.0B
- Novva Mesa — 300 MW, Mesa · permitted · developer: Novva Data Centers · ~$3.0B
- Tract Buckeye Technology Park — 1.8 GW, Buckeye · permitted · developer: Tract
- Beale Luckett Data Center (Marana) — 750 MW, Marana · permitted · developer: Beale Infrastructure
- CyrusOne Mesa — 198 MW, Mesa · permitted · developer: CyrusOne
Frequently asked questions
- How many data centers are in Arizona?
- Data Center Index tracks 24 named data center campuses in Arizona as of 2026: 13 operating, 2 under construction, and 9 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Arizona have?
- 2.4 GW is operating, with 4.4 GW in the announced and under-construction pipeline. 9 of the 18 Arizona campuses carrying a capacity figure show an estimate rather than a figure a named source states, marked "est." on the site.
- What is the largest data center in Arizona?
- Tract Buckeye Technology Park in Buckeye is the largest tracked campus in Arizona at 1.8 GW, developed by Tract. That capacity is stated by a named source.
- Who is building data centers in Arizona?
- The most active developers in Arizona by tracked campus count are Microsoft (2 campuses), QTS Data Centers (2 campuses), STACK Infrastructure (2 campuses). Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves Arizona data centers?
- APS / SRP runs the grid and the interconnection queue for Arizona, so new campus power requests are approved on its timeline.
Public companies exposed to Arizona
These public companies have tracked data-center projects in Arizona as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Alphabet (GOOGL) — hyperscaler · 1 project in Arizona
- Intel (INTC) — chip fab · 1 project in Arizona
- Microsoft (MSFT) — hyperscaler · 1 project in Arizona
- OpenAI (OPENAI) — ai lab · 1 project in Arizona
- Taiwan Semiconductor Manufacturing (TSM) — chip fab · 1 project in Arizona
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers — 55 tracked projects, 63.3 GW pipeline
- Utah data centers — 7 tracked projects, 21.1 GW pipeline
- Pennsylvania data centers — 16 tracked projects, 15.7 GW pipeline
- Ohio data centers — 25 tracked projects, 13.3 GW pipeline
- Virginia data centers — 34 tracked projects, 9.8 GW pipeline
- Kentucky data centers — 8 tracked projects, 8.9 GW pipeline
- Georgia data centers — 26 tracked projects, 8.1 GW pipeline
- Wyoming data centers — 7 tracked projects, 6.1 GW pipeline
- West Virginia data centers — 4 tracked projects, 6.1 GW pipeline
- Florida data centers — 7 tracked projects, 5.9 GW pipeline
- Illinois data centers — 13 tracked projects, 5.5 GW pipeline
- Maryland data centers — 8 tracked projects, 5.3 GW pipeline
- Indiana data centers — 11 tracked projects, 5.0 GW pipeline
- Kansas data centers — 10 tracked projects, 4.5 GW pipeline
- Oklahoma data centers — 12 tracked projects, 4.2 GW pipeline
- North Carolina data centers — 15 tracked projects, 4.1 GW pipeline
- Alabama data centers — 9 tracked projects, 3.4 GW pipeline
- Nebraska data centers — 7 tracked projects, 3.1 GW pipeline
- Louisiana data centers — 8 tracked projects, 3.0 GW pipeline
- Michigan data centers — 9 tracked projects, 2.6 GW pipeline
- Arkansas data centers — 7 tracked projects, 2.5 GW pipeline
- Oregon data centers — 13 tracked projects, 2.5 GW pipeline
- New York data centers — 7 tracked projects, 2.3 GW pipeline
- South Carolina data centers — 8 tracked projects, 1.9 GW pipeline
- Missouri data centers — 6 tracked projects, 1.7 GW pipeline
- Nevada data centers — 10 tracked projects, 1.6 GW pipeline
- Wisconsin data centers — 4 tracked projects, 1.5 GW pipeline
- California data centers — 15 tracked projects, 1.4 GW pipeline
- North Dakota data centers — 4 tracked projects, 1.4 GW pipeline
- Iowa data centers — 8 tracked projects, 1.4 GW pipeline
- Delaware data centers — 1 tracked project, 1.2 GW pipeline
- Montana data centers — 2 tracked projects, 1.1 GW pipeline
- Washington data centers — 5 tracked projects, 1.0 GW pipeline
- Colorado data centers — 4 tracked projects, 800 MW pipeline
- Mississippi data centers — 7 tracked projects, 616 MW pipeline
- Minnesota data centers — 4 tracked projects, 600 MW pipeline
- New Jersey data centers — 3 tracked projects, 550 MW pipeline
- South Dakota data centers — 2 tracked projects, 500 MW pipeline
- Massachusetts data centers — 1 tracked project, 274 MW pipeline
- Idaho data centers — 3 tracked projects, 240 MW pipeline
- Tennessee data centers — 7 tracked projects, 110 MW pipeline
- Connecticut data centers — 1 tracked project, 100 MW pipeline
- New Mexico data centers — 2 tracked projects