EdgeCore Mesa
450 MW AI data center in Mesa, AZ, United States — under construction.
- Capacity: 450 MW
- Location: Mesa, AZ, United States
- Developer: EdgeCore Digital Infrastructure
- Status: under construction
EdgeCore Mesa is a 450 MW AI data center project located in Mesa, AZ, United States, currently under construction. It is being built by EdgeCore Digital Infrastructure. This project is one of thousands of data-center facilities tracked by Data Center Index across AZ, United States — covering operational, under-construction, announced, and permitted sites.
Project description
EdgeCore said its Mesa campus has 206 MW operational since April 2023 (PH01), two buildings (PH02, PH03) under construction for 2025-2026 delivery, and a 43.87-acre acquisition enabling another 250+ MW for a 450+ MW total.
Related data center projects
- EdgeCore Reno (TRIC) — 216 MW, McCarran, NV, United States · under construction
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction