EdgeCore Reno (TRIC)
216 MW AI data center in McCarran, NV, United States — under construction.
- Capacity: 216 MW
- Location: McCarran, NV, United States
- Developer: EdgeCore Digital Infrastructure
- Status: under construction
EdgeCore Reno (TRIC) is a 216 MW AI data center project located in McCarran, NV, United States, currently under construction. It is being built by EdgeCore Digital Infrastructure. This project is one of thousands of data-center facilities tracked by Data Center Index across NV, United States — covering operational, under-construction, announced, and permitted sites.
Project description
EdgeCore's Reno campus in the Tahoe-Reno Industrial Center will total nearly 1M sq ft across three hyperscale buildings on 56 acres supporting 216 MW of critical IT load upon completion.
Related data center projects
- EdgeCore Mesa — 450 MW, Mesa, AZ, United States · under construction
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction