EdgeCore Reno (TRIC)
216 MW AI data center in McCarran, NV, United States: under construction.
- Capacity: 216 MW
- Location: McCarran, NV, United States
- Developer: EdgeCore Digital Infrastructure
- Status: under construction
EdgeCore Reno (TRIC) is a 216 MW AI data center project located in McCarran, NV, United States, currently under construction. It is being built by EdgeCore Digital Infrastructure. This project is one of thousands of data-center facilities tracked by Data Center Index across NV, United States, covering operational, under-construction, announced, and permitted sites.
Project description
EdgeCore's Reno campus sits in the Tahoe-Reno Industrial Center on 56 acres. Once complete it'll total nearly 1M sq ft across three hyperscale buildings and support 216 MW of critical IT load.
Related data center projects
- EdgeCore Shannon Hill Regional Business Park, 1.1 GW, Louisa, VA, United States · announced
- EdgeCore Mesa, 496 MW, Mesa, AZ, United States · operational
- EdgeCore Culpeper Technology Zone Campus, 196 MW, Culpeper, VA, United States · announced
- EdgeCore Ashburn Campus (Maries Road / Moran Road), Sterling, VA, United States · permitted
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Snowville, UT, United States · announced
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
Frequently asked questions
- What is EdgeCore Reno (TRIC)?
- EdgeCore Reno (TRIC) is an AI data center project in McCarran, Nevada tracked by Data Center Index. Its status is under construction.
- Where is EdgeCore Reno (TRIC)?
- EdgeCore Reno (TRIC) is in McCarran, Nevada. Every tracked Nevada campus, with counts and capacity, is at https://datacenterindex.ai/markets/nevada.
- How big is EdgeCore Reno (TRIC)?
- Data Center Index tracks EdgeCore Reno (TRIC) at 216 MW. The developer or the press states that capacity, in a source dated October 7, 2026.
- Who is building EdgeCore Reno (TRIC)?
- EdgeCore Digital Infrastructure is developing EdgeCore Reno (TRIC).
Sources
- Reno Data Center Campus | EdgeCore (edgecore.com · press · 2026-10-07)
- Data Center Frontier (datacenterfrontier.com · press · 2025-07-25)
- DatacenterDynamics (datacenterdynamics.com · press · 2026-08-04)
- Lightwave (lightwaveonline.com · press · 2025-07-25)