EdgeCore Culpeper Technology Zone Campus
432 MW AI data center in Culpeper, VA, United States: announced.
- Capacity: 432 MW
- Location: Culpeper, VA, United States
- Developer: EdgeCore Digital Infrastructure
- Status: announced
EdgeCore Culpeper Technology Zone Campus is a 432 MW AI data center project located in Culpeper, VA, United States, currently announced. It is being built by EdgeCore Digital Infrastructure. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
EdgeCore bought 120 acres in the Culpeper Technology Zone for a 1.4M sq ft campus supporting 216 MW of critical IT load initially and up to 432 MW; its current Culpeper page says capacity is available from mid-2029, with no construction start reported.
Related data center projects
- EdgeCore Mesa, 496 MW, Mesa, AZ, United States · operational
- EdgeCore Reno (TRIC), 216 MW, McCarran, NV, United States · under construction
- EdgeCore Ashburn Campus (Maries Road / Moran Road), Sterling, VA, United States · permitted
- Creekstone Delta Gigasite, 10.0 GW, Delta, UT, United States · under construction
- Stratos Hyperscale Data Center, 9.0 GW, Hansel Valley, UT, United States · announced
- PORTS-Pike Technology Campus, 8.0 GW, Piketon, OH, United States · under construction
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Meta Hyperion, 5.0 GW, Holly Ridge, LA, United States · under construction