NTT Mesa (Elliot Road campus)
240 MW AI data center in Mesa, AZ, United States — operational.
- Capacity: 240 MW
- Location: Mesa, AZ, United States
- Developer: NTT Global Data Centers
- Status: operational
NTT Mesa (Elliot Road campus) is a 240 MW AI data center project located in Mesa, AZ, United States, currently operational. It is being built by NTT Global Data Centers. This project is one of thousands of data-center facilities tracked by Data Center Index across AZ, United States — covering operational, under-construction, announced, and permitted sites.
Project description
NTT broke ground on a 240 MW, 102-acre campus in Mesa with an electrical substation due spring 2021 and a first 36 MW building in early 2022.
Related data center projects
- NTT Hillsboro Campus (HI1-HI2 + expansion) — 354 MW, Hillsboro, OR, United States · under construction
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction