Fab 21 Phase 1 (N4)
AI data center in Phoenix, AZ, United States — operational.
- Location: Phoenix, AZ, United States
- Developer: TSMC
- Status: operational
- Estimated cost: $12.0B
Fab 21 Phase 1 (N4) is a AI data center project located in Phoenix, AZ, United States, currently operational. It is being built by TSMC. The estimated build cost is $12.0B. This project is one of thousands of data-center facilities tracked by Data Center Index across AZ, United States — covering operational, under-construction, announced, and permitted sites.
Public companies linked to Fab 21 Phase 1 (N4)
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Taiwan Semiconductor Manufacturing (TSM) — developer · chip fab
Related data center projects
- JASM Fab 1 (Kumamoto), Kumamoto, Japan, Japan · operational
- ESMC Dresden, Dresden, Germany, Germany · under construction
- Nexus Hubbard Campus — 7.2 GW, Hubbard, OH, United States · under construction
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction
- Microsoft Fairwater Wisconsin — 3.3 GW, Mount Pleasant, WI, United States · operational
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced
- AWS Project Rainier (New Carlisle, Indiana) — 2.4 GW, New Carlisle, IN, United States · operational
- Meta Hyperion — 2.3 GW, Holly Ridge, LA, United States · operational