Microsoft Goodyear
263 MW AI data center in Goodyear, AZ, United States — operational.
- Capacity: 263 MW
- Location: Goodyear, AZ, United States
- Developer: Microsoft
- Tenant: OpenAI
- Status: operational
- Estimated cost: $7.9B
- Energy source: Renewable (solar + wind PPAs)
Microsoft Goodyear is a 263 MW AI data center project located in Goodyear, AZ, United States, currently operational. It is being built by Microsoft for tenant OpenAI. The estimated build cost is $7.9B. Power for the facility is sourced from Renewable (solar + wind PPAs). This project is one of thousands of data-center facilities tracked by Data Center Index across AZ, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Users: OpenAI; Epoch 'Current power' = 263 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Microsoft Goodyear
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Microsoft (MSFT) — developer · hyperscaler
- OpenAI (OPENAI) — tenant · ai lab
Related data center projects
- Microsoft Fairwater Wisconsin — 3.3 GW, Mount Pleasant, WI, United States · operational
- Azure Northern Virginia — 1.0 GW, Northern Virginia, VA, United States · operational
- Project Jupiter (NM) — 1.0 GW, New Mexico, NM, United States · announced
- Microsoft — Australia AI Expansion — 1.0 GW, Sydney, Melbourne, Canberra, Australia · operational
- Crusoe Abilene Expansion — 941 MW, Abilene, TX, United States · operational
- Microsoft Fairwater Atlanta — 859 MW, Fayetteville, GA, United States · operational
- Microsoft — Lordstown AI Campus (Stargate Phase 1) — 600 MW, Lordstown, OH, United States · announced
- Microsoft — India AI Infrastructure (Hyderabad / Pune) — 600 MW, Hyderabad, India · under construction