Google Mesa
183 MW AI data center in AZ, United States: operational.
- Capacity: 183 MW
- Location: AZ, United States
- Developer: Google
- Status: operational
- Estimated cost: $0.6B
Google Mesa is a 183 MW AI data center project located in AZ, United States, currently operational. It is being built by Google. The estimated build cost is $0.6B. This project is one of thousands of data-center facilities tracked by Data Center Index across AZ, United States, covering operational, under-construction, announced, and permitted sites.
Notes
Epoch 'Current power' = 183 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Google Mesa
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Alphabet (GOOGL), developer · hyperscaler
Related data center projects
- Google Project Tembo (Cheyenne), 1.8 GW, Cheyenne, WY, United States · permitted
- EcoDataCenter 1, 1 GW, Fort Wayne, IN, United States · under construction
- Gemini Cluster (Iowa), 1 GW, Council Bluffs, IA, United States · operational
- Wilbarger Campus, 800 MW, Vernon, TX, United States · under construction
- Google West Memphis Data Center, 600 MW, West Memphis, AR, United States · under construction
- Google Fredericia (Taulov) AI Data Center, 550 MW, Fredericia, Denmark · operational
- Google-Kairos Power AI Data Center Initiative, 500 MW, Oak Ridge, TN, United States · announced
- Haskell County Campus, 440 MW, Haskell, TX, United States · under construction
Frequently asked questions
- What is Google Mesa?
- Google Mesa is an AI data center project in Arizona tracked by Data Center Index. Its status is operational, and it is still adding buildings.
- Where is Google Mesa?
- Google Mesa is in Arizona. Every tracked Arizona campus, with counts and capacity, is at https://datacenterindex.ai/markets/arizona.
- How big is Google Mesa?
- Data Center Index tracks Google Mesa at 183 MW, on an estimated $0.6B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Google Mesa?
- Google is developing Google Mesa.
- When will Google Mesa come online?
- Google Mesa is already operating. The next building is expected to go live 2030.
- Which public companies are linked to Google Mesa?
- Data Center Index links 1 tracked public company to Google Mesa: Alphabet (GOOGL). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Construction Review Online (constructionreviewonline.com · press · 2026-05-07)
- Google Mesa | AI Data Centers (epoch.ai · aggregator · 2026-09-11)
- Greater Phoenix Economic Council (gpec.org · press · 2023-09-06)
- AZBEX (azbex.com · press · 2026-05-07)