OpenAI (OPENAI)
Tracked AI data center portfolio for OpenAI: live capex history, supplier exposure, and project map.
- Ticker: OPENAI
- Projects tracked: 8
- Total pipeline: 14 GW
Projects
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- OpenAI Project Camellia, 3.2 GW, Effingham County, GA, United States · announced
- OpenAI Stargate Milam, 1.2 GW, Milam County, TX, United States · under construction
- OpenAI Stargate UAE, 1 GW, Abu Dhabi, United Arab Emirates · under construction
- OpenAI Stargate Lordstown, 214 MW, Lordstown, OH, United States · under construction
- Microsoft Goodyear, 202 MW, Goodyear, AZ, United States · operational
- Microsoft Project Osmium, 190 MW, West Des Moines, IA, United States · operational
- Microsoft Fairwater Wisconsin, Mount Pleasant, WI, United States · operational
- OpenAI Stargate U.S. Infrastructure Program, United States · announced
- OpenAI Paris Office and France Infrastructure Watch, Paris, France · announced
Frequently asked questions
- How many data centers does OpenAI have?
- Data Center Index tracks 8 data center campuses with OpenAI named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does OpenAI have?
- 14 GW across 8 tracked campuses, counting operating and pipeline sites together. Of the 7 OpenAI campuses with a capacity figure, 0 are filed, 3 stated and 4 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does OpenAI build data centers?
- Tracked OpenAI campuses sit in 9 markets: OH (2), AZ (1), France (1), GA (1), IA (1), TX (1), United Arab Emirates (1), United States (1), and 1 more. The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest OpenAI data center?
- PORTS-Pike Technology Campus in Pike County, OH is the largest tracked OpenAI campus at 8 GW, currently announced. The developer or the press states that capacity, in a source dated August 18, 2026.