Vantage Data Centers (VANTAGE)
Builds and operates wholesale data center campuses for hyperscalers and cloud providers across North America, EMEA and APAC. Privately held, controlled by DigitalBridge with Silver Lake as co-investor.
- Type: Hyperscale campus developer
- Ownership: Private, backed by DigitalBridge
- Headquarters: Denver, CO
- Founded: 2010
- Website: vantage-dc.com
- Ticker: VANTAGE
- Projects tracked: 18
- Total pipeline: 4.9 GW
Projects
- OpenAI Stargate Shackelford, 1.4 GW, Shackelford County, TX, United States · under construction
- OpenAI Stargate Wisconsin, 902 MW, Port Washington, WI, United States · under construction
- Vantage OH2 Millersport Campus, 696 MW, Millersport, OH, United States · under construction
- Vantage Wyoming Campus (Project Latigo), 480 MW, Cheyenne, WY, United States · permitted
- Vantage Trident Data Center, 334 MW, Aurora, CO, United States · announced
- Vantage Nevada AI Data Center (NV1), 224 MW, McCarran, NV, United States · under construction
- Vantage OH1 New Albany Campus, 192 MW, New Albany, OH, United States · under construction
- Vantage VA4 (Stafford), 192 MW, Stafford, VA, United States · under construction
- Vantage Data Centers Quebec Expansion (Montreal & Quebec City), 178 MW, Montreal, Canada · operational
- Vantage AZ1 Goodyear, 176 MW, Goodyear, AZ, United States · operational
- Vantage Data Centers US West AI Campus (Santa Clara/Phoenix), 144 MW, Santa Clara, CA, United States · operational
- Vantage TX1, 128 MW, San Antonio, TX, United States · operational
- Vantage Ashburn II (VA2), 96 MW, Sterling, VA, United States · operational
- Vantage Quincy (WA1) Campus, 89 MW, Quincy, WA, United States · operational
- Vantage VA1 Campus (Sterling), Sterling, VA, United States · operational
- Vantage Ashburn III (VA3), Ashburn, VA, United States · permitted
- Vantage Douglasville Campus, Douglasville, GA, United States · announced
- Vantage San Antonio II (Rogers Road), San Antonio, TX, United States · operational
- Vantage Pittsboro Campus, Pittsboro, IN, United States · permitted
- Vantage Data Centers TX3, Abilene, TX, United States · permitted
Frequently asked questions
- How many data centers does Vantage Data Centers have?
- Data Center Index tracks 18 data center campuses with Vantage Data Centers named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Vantage Data Centers have?
- 4.9 GW across 18 tracked campuses, counting operating and pipeline sites together. Of the 14 Vantage Data Centers campuses with a capacity figure, 0 are filed, 11 stated and 3 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Vantage Data Centers build data centers?
- Tracked Vantage Data Centers campuses sit in 13 markets: TX (4), VA (4), OH (2), AZ (1), CA (1), Canada (1), CO (1), GA (1), and 5 more. The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Vantage Data Centers data center?
- OpenAI Stargate Shackelford in Shackelford County, TX is the largest tracked Vantage Data Centers campus at 1.4 GW, currently under construction. The developer or the press states that capacity, in a source dated December 16, 2025.