Vantage Wyoming Campus (Project Latigo)
480 MW AI data center in Cheyenne, WY, United States: permitted.
- Capacity: 480 MW
- Location: Cheyenne, WY, United States
- Developer: Vantage Data Centers
- Status: permitted
- Estimated cost: $4.8B
Vantage Wyoming Campus (Project Latigo) is a 480 MW AI data center project located in Cheyenne, WY, United States, currently permitted. It is being built by Vantage Data Centers. The estimated build cost is $4.8B. This project is one of thousands of data-center facilities tracked by Data Center Index across WY, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Vantage proposes a 480 MW campus of three to five buildings on 1,800 acres on Terry Ranch Road, 12 miles south of Cheyenne, and it's scalable to 1 GW. It would have an on-site gas plant and closed-loop cooling. Initial investment is $4.8B to $9.6B, with permitting in late 2026 to 2027 and a grading permit targeted for early 2027.
Related data center projects
- OpenAI Stargate Shackelford, 1.4 GW, Shackelford County, TX, United States · under construction
- OpenAI Stargate Wisconsin, 902 MW, Port Washington, WI, United States · under construction
- Vantage OH2 Millersport Campus, 696 MW, Millersport, OH, United States · under construction
- Vantage Trident Data Center, 334 MW, Aurora, CO, United States · announced
- Vantage Nevada AI Data Center (NV1), 224 MW, McCarran, NV, United States · under construction
- Vantage OH1 New Albany Campus, 192 MW, New Albany, OH, United States · under construction
- Vantage VA4 (Stafford), 192 MW, Stafford, VA, United States · under construction
- Vantage Data Centers Quebec Expansion (Montreal & Quebec City), 178 MW, Montreal, Canada · operational
Frequently asked questions
- What is Vantage Wyoming Campus (Project Latigo)?
- Vantage Wyoming Campus (Project Latigo) is an AI data center project in Cheyenne, Wyoming tracked by Data Center Index. Its status is permitted.
- Where is Vantage Wyoming Campus (Project Latigo)?
- Vantage Wyoming Campus (Project Latigo) is in Cheyenne, Wyoming. Every tracked Wyoming campus, with counts and capacity, is at https://datacenterindex.ai/markets/wyoming.
- How big is Vantage Wyoming Campus (Project Latigo)?
- Data Center Index tracks Vantage Wyoming Campus (Project Latigo) at 480 MW, on an estimated $4.8B build. The developer or the press states that capacity, in a source dated October 7, 2026.
- Who is building Vantage Wyoming Campus (Project Latigo)?
- Vantage Data Centers is developing Vantage Wyoming Campus (Project Latigo).
Sources
- Vantage hosts open house for proposed data center in southern Wyoming (wyomingnews.com · press · 2026-07-02)
- Wyoming Tribune Eagle / WyomingNews (wyomingnews.com · press · 2026-09-20)
- Wyoming Tribune Eagle (via Yahoo News) (yahoo.com · press · 2026-09-05)
- Wyoming Tribune Eagle / Laramie Boomerang (wyomingnews.com · press · 2026-10-07)
- Cap City News (Cheyenne) (capcity.news · press · 2026-09-01)