Vantage Nevada AI Data Center (NV1)
224 MW AI data center in McCarran, NV, United States: under construction.
- Capacity: 224 MW
- Location: McCarran, NV, United States
- Developer: Vantage Data Centers
- Status: under construction
- Estimated cost: $3B
- Energy source: Solar (Utility PPA)
Vantage Nevada AI Data Center (NV1) is a 224 MW AI data center project located in McCarran, NV, United States, currently under construction. It is being built by Vantage Data Centers. The estimated build cost is $3B. Its energy source is listed as Solar (Utility PPA). This project is one of thousands of data-center facilities tracked by Data Center Index across NV, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Vantage has been building its NV1 site in Henderson, Nevada since 2025. The 224 MW hyperscale build is backed by a utility solar PPA, and its first phases are expected online in stages.
Public companies linked to Vantage Nevada AI Data Center (NV1)
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Vantage Data Centers (VANTAGE), developer · dc operator
Related data center projects
- OpenAI Stargate Shackelford, 1.4 GW, Shackelford County, TX, United States · under construction
- Vantage Wyoming Campus (Project Latigo), 480 MW, Cheyenne, WY, United States · permitted
- Vantage Trident Data Center, 334 MW, Aurora, CO, United States · announced
- Vantage OH1 New Albany Campus, 192 MW, New Albany, OH, United States · under construction
- Vantage VA4 (Stafford), 192 MW, Stafford, VA, United States · under construction
- Vantage Data Centers Quebec Expansion (Montreal & Quebec City), 178 MW, Montreal, Canada · operational
- Vantage AZ1 Goodyear, 176 MW, Goodyear, AZ, United States · operational
- Vantage Data Centers US West AI Campus (Santa Clara/Phoenix), 144 MW, Santa Clara, CA, United States · operational
Frequently asked questions
- What is Vantage Nevada AI Data Center (NV1)?
- Vantage Nevada AI Data Center (NV1) is an AI data center project in McCarran, Nevada tracked by Data Center Index. Its status is under construction.
- Where is Vantage Nevada AI Data Center (NV1)?
- Vantage Nevada AI Data Center (NV1) is in McCarran, Nevada. Every tracked Nevada campus, with counts and capacity, is at https://datacenterindex.ai/markets/nevada.
- How big is Vantage Nevada AI Data Center (NV1)?
- Data Center Index tracks Vantage Nevada AI Data Center (NV1) at 224 MW, on an estimated $3B build. The developer or the press states that capacity, in a source dated July 15, 2025.
- Who is building Vantage Nevada AI Data Center (NV1)?
- Vantage Data Centers is developing Vantage Nevada AI Data Center (NV1).
- When will Vantage Nevada AI Data Center (NV1) come online?
- The next building at Vantage Nevada AI Data Center (NV1) is expected online December 31, 2026. That date is the first building going live, not the full build-out.
- Which public companies are linked to Vantage Nevada AI Data Center (NV1)?
- Data Center Index links 1 tracked public company to Vantage Nevada AI Data Center (NV1): Vantage Data Centers (VANTAGE). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- AI Data Center Index facility profile: Vantage Nevada Ai Data Center (aidci · aggregator · 2026-04-29)
- Vantage Data Centers (press release) (vantage-dc.com · press · 2025-07-15)
- $3 billion data center project at TRIC pushing forward (nevadaappeal.com · press · 2025-08-05)
- Data Center Frontier (datacenterfrontier.com · press · 2025-07-15)