Vantage TX1
179 MW AI data center in San Antonio, TX, United States — under construction.
- Capacity: 179 MW
- Location: San Antonio, TX, United States
- Status: under construction
- Estimated cost: $1.2B
- Energy source: Private Power Generation (Wind/Solar/Storage Hybrid)
Vantage TX1 is a 179 MW AI data center project located in San Antonio, TX, United States, currently under construction.. The estimated build cost is $1.2B. Power for the facility is sourced from Private Power Generation (Wind/Solar/Storage Hybrid). This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Epoch 'Current power' = 32 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Related data center projects
- QTS Cedar Rapids — 1.6 GW, Fairfax, IA, United States · operational
- QTS Richmond — 921 MW, Sandston, VA, United States · operational
- STACK Infrastructure NVA02 — 487 MW, Manassas, VA, United States · operational
- QTS Richmond 3 — 336 MW, Sandston, VA, United States · operational
- QTS Richmond 1 — 333 MW, Sandston, VA, United States · announced
- Stream Phoenix — 267 MW, AZ, United States · operational
- QTS Richmond 2 — 252 MW, Sandston, VA, United States · operational
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction