Crusoe Abilene Expansion
941 MW AI data center in Abilene, TX, United States — operational.
- Capacity: 941 MW
- Location: Abilene, TX, United States
- Developer: Microsoft
- Status: operational
Crusoe Abilene Expansion is a 941 MW AI data center project located in Abilene, TX, United States, currently operational. It is being built by Microsoft. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Crusoe's Abilene expansion serves Microsoft as the tracked user, operational at 941 MW. The supplier list runs from SK Hynix and Micron on memory to Caterpillar, GE Vernova and Primoris on power and construction — plus Nvidia on compute.
Notes
Users: Microsoft
Public companies linked to Crusoe Abilene Expansion
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Microsoft (MSFT) — developer · hyperscaler
- Microsoft (MSFT) — tenant · hyperscaler
- Caterpillar (CAT) — genset · power equipment · mid DC exposure
- Primoris Services (PRIM) — engineering · construction · mid DC exposure
- NVIDIA (NVDA) — investor · semiconductor
- Micron Technology (MU) — memory supplier · chip fab · high DC exposure
- SK Hynix (000660.KS) — memory supplier · chip fab · high DC exposure
- GE Vernova (GEV) — turbines grid · power equipment · mid DC exposure
Related data center projects
- Microsoft Fairwater Wisconsin — 2.7 GW, Mount Pleasant, WI, United States · operational
- Azure Northern Virginia — 1.0 GW, Northern Virginia, VA, United States · operational
- Project Jupiter (NM) — 1.0 GW, New Mexico, NM, United States · announced
- Microsoft — Australia AI Expansion — 1.0 GW, Sydney, Melbourne, Canberra, Australia · operational
- Microsoft Fairwater Atlanta — 859 MW, Fayetteville, GA, United States · operational
- Microsoft — Lordstown AI Campus (Stargate Phase 1) — 600 MW, Lordstown, OH, United States · announced
- Microsoft — India AI Infrastructure (Hyderabad / Pune) — 600 MW, India · under construction
- Microsoft Azure — UK South Region (London) — 500 MW, London, United Kingdom · operational