Vistra's Comanche Peak Nuclear Data Center Campus
1.2 GW AI data center in Glen Rose, United States — announced.
- Capacity: 1.2 GW
- Location: Glen Rose, United States
- Developer: Vistra Corp
- Status: announced
- Energy source: Nuclear
Vistra's Comanche Peak Nuclear Data Center Campus is a 1.2 GW AI data center project located in Glen Rose, United States, currently announced. It is being built by Vistra Corp. Power for the facility is sourced from Nuclear. This project is one of thousands of data-center facilities tracked by Data Center Index across United States — covering operational, under-construction, announced, and permitted sites.
Public companies linked to Vistra's Comanche Peak Nuclear Data Center Campus
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Amazon (AMZN) — developer · hyperscaler
- Vistra Corp (VST) — developer · energy · mid DC exposure
- Emerson Electric (EMR) — power management · power equipment · mid DC exposure
Related data center projects
- Nexus Hubbard Campus — 7.2 GW, Hubbard, OH, United States · under construction
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction
- Microsoft Fairwater Wisconsin — 3.3 GW, Mount Pleasant, WI, United States · operational
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced
- AWS Project Rainier (New Carlisle, Indiana) — 2.4 GW, New Carlisle, IN, United States · operational
- Meta Hyperion — 2.3 GW, Holly Ridge, LA, United States · operational
- Diablo Canyon AI Integration Project — 2.3 GW, Avila Beach, United States · operational
- OpenAI Stargate New Mexico — 2.2 GW, NM, United States · under construction