Abilene and Big Country Data Centers
This page covers Abilene and the Big Country, the 19 counties of the West Central Texas Council of Governments, from Haskell and Shackelford south to Brown and Coleman and west to Scurry and Mitchell. It is wind country, inside ERCOT's West load zone. 7 data center campuses are open, being built or planned here: 1 operating (1 still adding buildings) and 6 under construction. The largest is Sweetwater Campus in Fisher County, at 2 GW, developed by IREN. Taylor County has the most campuses, with 2.
- Campuses: 7
- Operating: 1 (1 expanding)
- Under construction: 6
- Announced or permitted: 0
- Capacity at full build: 6.6 GW (includes 2 est. figures)
Data center campuses in Abilene and the Big Country
- OpenAI Stargate Abilene, Abilene (Taylor County) · operational · 1.2 GW · developer: Crusoe
- Sweetwater Campus, Fisher County (Fisher County) · under construction · 2 GW · developer: IREN
- OpenAI Stargate Shackelford, Shackelford County (Shackelford County) · under construction · 1.4 GW · developer: Vantage Data Centers
- Crusoe Abilene Expansion, Abilene (Taylor County) · under construction · 900 MW · developer: Crusoe
- Energy Vault Snyder AI Campus, Scurry County (Scurry County) · under construction · 500 MW est. · developer: Energy Vault Holdings
- Haskell County Campus, Haskell County (Haskell County) · under construction · 440 MW est. · developer: Google
- Cipher Barber Lake, Mitchell County (Mitchell County) · under construction · 207 MW · developer: Cipher Digital
Questions about Abilene and the Big Country data centers
- How many data centers are in Abilene and the Big Country?
- 7 named data center campuses are in Abilene and the Big Country as of 2026: 1 operating (1 still adding buildings) and 6 under construction. The count covers named campuses with a published source, not every building, and leaves out paused or cancelled projects.
- What is the largest data center in Abilene and the Big Country?
- Sweetwater Campus in Fisher County is the largest at 2 GW, developed by IREN. It is under construction.
- Which data centers are under construction in Abilene and the Big Country?
- 6 campuses are under construction: Sweetwater Campus (Fisher County), OpenAI Stargate Shackelford (Shackelford County), Crusoe Abilene Expansion (Abilene), Energy Vault Snyder AI Campus (Scurry County), Haskell County Campus (Haskell County) and Cipher Barber Lake (Mitchell County).
- How much data center capacity is planned in Abilene and the Big Country?
- The 7 campuses with a published capacity add up to 6.6 GW at full build. 2 of those figures are estimates, marked "est." in the list.
- Which counties are in Abilene and the Big Country?
- This page follows the West Central Texas Council of Governments planning region: Brown, Callahan, Coleman, Comanche, Eastland, Fisher, Haskell, Jones, Kent, Knox, Mitchell, Nolan, Runnels, Scurry, Shackelford, Stephens, Stonewall, Taylor and Throckmorton counties. Campuses sit in Taylor County (2), Fisher County (1), Haskell County (1), Mitchell County (1), Scurry County (1) and Shackelford County (1).
Other Texas regions
- North Texas data centers, 53 campuses
- Central Texas data centers, 26 campuses
- West Texas data centers, 13 campuses
- Texas Panhandle and South Plains data centers, 12 campuses
- San Antonio and South Texas data centers, 22 campuses