Energy Vault Snyder AI Campus

500 MW AI data center in Scurry County, TX, United States: under construction.

Energy Vault Snyder AI Campus is a 500 MW AI data center project located in Scurry County, TX, United States, currently under construction. It is being built by Energy Vault Holdings for tenant Crusoe Cloud. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States, covering operational, under-construction, announced, and permitted sites.

Project description

Energy Vault broke ground on a powered AI campus in Snyder for Crusoe Cloud: an initial 8 MW phase expandable to 25 MW, with the site planned for up to 500 MW.

Public companies linked to Energy Vault Snyder AI Campus

Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:

Related data center projects

Frequently asked questions

What is Energy Vault Snyder AI Campus?
Energy Vault Snyder AI Campus is an AI data center project in Scurry County, Texas tracked by Data Center Index. Its status is under construction.
Where is Energy Vault Snyder AI Campus?
Energy Vault Snyder AI Campus is in Scurry County, Texas. Every tracked Texas campus, with counts and capacity, is at https://datacenterindex.ai/markets/texas.
How big is Energy Vault Snyder AI Campus?
Data Center Index tracks Energy Vault Snyder AI Campus at 500 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
Who is building Energy Vault Snyder AI Campus?
Energy Vault Holdings is developing Energy Vault Snyder AI Campus, with Crusoe Cloud named as the tenant.
When will Energy Vault Snyder AI Campus come online?
The next building at Energy Vault Snyder AI Campus is expected online 2027-03. That date is the first building going live, not the full build-out.
Which public companies are linked to Energy Vault Snyder AI Campus?
Data Center Index links 1 tracked public company to Energy Vault Snyder AI Campus: Crusoe (CRUSOE). Each is a developer, tenant or supplier with a sourced link to the project.

Sources

  1. Energy Vault Breaks Ground on Powered AI Infrastructure Campus in Snyder, Texas to Deploy Crusoe Spark Modular Data Centers (stocktitan.net · press · 2026-07-27)
  2. POWER Magazine (Energy Vault press release) (powermag.com · press · 2026-07-27)
  3. Energy Vault Reports Second Quarter 2026 Financial Results (finviz.com · press · 2026-08-11)
  4. Energy Vault Holdings (SEC filing) (sec.gov · filing · 2025-05-13)
  5. SnyderAI: Powered AI Campus, Texas (energyvault.com · press · 2026-11-01)