West Texas Data Centers: Permian Basin, El Paso and San Angelo
This page covers the Permian Basin, El Paso and San Angelo: 36 counties from Midland and Odessa west to the New Mexico line. The Permian is on the ERCOT grid. El Paso is not: El Paso Electric serves it as part of the Western Interconnection. 13 data center campuses are open, being built or planned here: 5 operating (3 still adding buildings), 2 under construction and 6 announced or permitted. The largest is Microsoft Pecos (Reeves County) in Reeves County, at 2 GW, developed by Microsoft. The biggest build under way is Meta El Paso in El Paso (1 GW). Reeves County has the most campuses, with 3.
- Campuses: 13
- Operating: 5 (3 expanding)
- Under construction: 2
- Announced or permitted: 6
- Capacity at full build: 6 GW
Data center campuses in West Texas
- Core Scientific Pecos AI Campus, Reeves County (Reeves County) · operational · 1 GW · developer: Core Scientific
- Ionic Digital Cedarvale Campus, Ward County (Ward County) · operational · 700 MW · developer: Ionic Digital
- Cipher Black Pearl, Winkler County (Winkler County) · operational · 216 MW · developer: Cipher Digital
- Cipher Odessa, Odessa (Ector County) · operational · 207 MW · developer: Cipher Digital
- MARA Garden City, Garden City (Glasscock County) · operational · 200 MW · developer: MARA Holdings
- Meta El Paso, El Paso (El Paso County) · under construction · 1 GW · developer: Meta
- Cipher Stingray, Andrews County (Andrews County) · under construction · 70 MW · developer: Cipher Digital
- Microsoft Pecos (Reeves County), Reeves County (Reeves County) · announced · 2 GW · developer: Microsoft
- Project Horizon, Pecos County (Pecos County) · announced · 400 MW · developer: Poolside Infrastructure Company
- Alpha Digital Campus, Reeves County (Reeves County) · announced · developer: PowerBridge / LandBridge
- Texas Critical Data Centers (TCDC), Odessa (Ector County) · permitted · 250 MW · developer: New Era Energy & Digital
- GW Ranch, Fort Stockton (Pecos County) · permitted · developer: Pacifico Energy
- Skybox San Angelo Campus, San Angelo (Tom Green County) · permitted · developer: Skybox Data Centers
Questions about West Texas data centers
- How many data centers are in West Texas?
- 13 named data center campuses are in West Texas as of 2026: 5 operating (3 still adding buildings), 2 under construction and 6 announced or permitted. The count covers named campuses with a published source, not every building, and leaves out paused or cancelled projects.
- What is the largest data center in West Texas?
- Microsoft Pecos (Reeves County) in Reeves County is the largest at 2 GW, developed by Microsoft. It is announced.
- Which data centers are under construction in West Texas?
- 2 campuses are under construction: Meta El Paso (El Paso) and Cipher Stingray (Andrews County).
- How much data center capacity is planned in West Texas?
- The 10 campuses with a published capacity add up to 6 GW at full build. Every one of those figures comes from a filing, the developer or the press. The other 3 have no published figure yet.
- Which counties are in West Texas?
- This page follows the Permian Basin, Rio Grande and Concho Valley planning regions: Andrews, Borden, Crane, Dawson, Ector, Gaines, Glasscock, Howard, Loving, Martin, Midland, Pecos, Reeves, Terrell, Upton, Ward, Winkler, Brewster, Culberson, El Paso, Hudspeth, Jeff Davis, Presidio, Coke, Concho, Crockett, Irion, Kimble, Mason, McCulloch, Menard, Reagan, Schleicher, Sterling, Sutton and Tom Green counties. Campuses sit in Reeves County (3), Ector County (2), Pecos County (2), Andrews County (1), El Paso County (1), Glasscock County (1), Tom Green County (1), Ward County (1) and Winkler County (1).
Other Texas regions
- North Texas data centers, 53 campuses
- Central Texas data centers, 26 campuses
- Abilene and the Big Country data centers, 7 campuses
- Texas Panhandle and South Plains data centers, 12 campuses
- San Antonio and South Texas data centers, 22 campuses