El Paso DC
1.0 GW AI data center in El Paso, TX, United States — operational.
- Capacity: 1.0 GW
- Location: El Paso, TX, United States
- Developer: Meta
- Status: operational
- Estimated cost: $10.0B
- Energy source: Renewable
El Paso DC is a 1.0 GW AI data center project located in El Paso, TX, United States, currently operational. It is being built by Meta. The estimated build cost is $10.0B. Power for the facility is sourced from Renewable. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Meta's El Paso data center is operational at a tracked 1,000 MW, a $10 billion training site running on renewable supply. It came online in 2025 as one of Meta's largest Texas builds.
Public companies linked to El Paso DC
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Meta Platforms (META) — developer · hyperscaler
- Meta Platforms (META) — tenant · hyperscaler
Related data center projects
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction
- Meta Hyperion — 2.3 GW, Holly Ridge, LA, United States · operational
- Meta–Vistra Nuclear Uprate Agreement (OH/PA) — 2.1 GW, Perry, OH, United States · announced
- Meta Prometheus — 1.1 GW, New Albany, OH, United States · operational
- Project Domino — 1.0 GW, Lebanon, IN, United States · announced
- Meta AI Training Campus (Cortland, Illinois) — 800 MW, Cortland, IL, United States · under construction
- Meta-TerraPower Natrium Power Agreement — 690 MW, United States · announced
- Meta — Luleå, Sweden AI Data Center Campus — 300 MW, Luleå, Sweden · operational