Meta Lebanon Data Center (Project Domino)
1 GW AI data center in Lebanon, IN, United States: under construction.
- Capacity: 1 GW
- Location: Lebanon, IN, United States
- Developer: Meta
- Status: under construction
- Estimated cost: $10B
- Energy source: Solar/Wind (PPA)
Meta Lebanon Data Center (Project Domino) is a 1 GW AI data center project located in Lebanon, IN, United States, currently under construction. It is being built by Meta. The estimated build cost is $10B. Its energy source is listed as Solar/Wind (PPA). This project is one of thousands of data-center facilities tracked by Data Center Index across IN, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Meta's Project Domino is a planned $10 billion campus in Lebanon, Indiana. It's tracked at 1,000 MW with a 2026 start and has solar and wind PPAs behind it. SK Hynix is linked on the memory side, and the site covers both training and inference.
Public companies linked to Meta Lebanon Data Center (Project Domino)
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Meta Platforms (META), developer · hyperscaler
- Meta Platforms (META), tenant · hyperscaler
Related data center projects
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Meta–Vistra Nuclear Uprate Agreement (OH/PA), 2.1 GW, Perry, OH, United States · announced
- Meta El Paso, 1 GW, El Paso, TX, United States · under construction
- Meta Prometheus, 1 GW, New Albany, OH, United States · operational
- Meta DeKalb Data Center, 800 MW, DeKalb, IL, United States · operational
- Meta-TerraPower Natrium Power Agreement, 690 MW, United States · announced
- Meta Altoona, Iowa AI Data Center Campus, 350 MW, Altoona, IA, United States · operational
- Meta Luleå, Sweden AI Data Center Campus, 300 MW, Luleå, Sweden · operational
Frequently asked questions
- What is Meta Lebanon Data Center (Project Domino)?
- Meta Lebanon Data Center (Project Domino) is an AI data center project in Lebanon, Indiana tracked by Data Center Index. Its status is under construction.
- Where is Meta Lebanon Data Center (Project Domino)?
- Meta Lebanon Data Center (Project Domino) is in Lebanon, Indiana. Every tracked Indiana campus, with counts and capacity, is at https://datacenterindex.ai/markets/indiana.
- How big is Meta Lebanon Data Center (Project Domino)?
- Data Center Index tracks Meta Lebanon Data Center (Project Domino) at 1 GW, on an estimated $10B build. The developer or the press states that capacity, in a source dated February 11, 2026.
- Who is building Meta Lebanon Data Center (Project Domino)?
- Meta is developing Meta Lebanon Data Center (Project Domino).
- When will Meta Lebanon Data Center (Project Domino) come online?
- The next building at Meta Lebanon Data Center (Project Domino) is expected online 2027. That date is the first building going live, not the full build-out.
- Which public companies are linked to Meta Lebanon Data Center (Project Domino)?
- Data Center Index links 2 tracked public companies to Meta Lebanon Data Center (Project Domino): Meta Platforms (META), Meta Platforms (META). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Meta's New Data Center in Lebanon, Indiana Marks a Milestone AI Investment (about.fb.com · press · 2026-02-11)
- Data Center Knowledge (datacenterknowledge.com · press · 2026-02-11)
- City of Lebanon, Indiana (lebanon.in.gov · press · 2026-02-11)
- Details on long-expected Meta data center campus unveiled (indianacapitalchronicle.com · press · 2026-02-11)