Meta Prometheus
1.1 GW AI data center in New Albany, OH, United States — operational.
- Capacity: 1.1 GW
- Location: New Albany, OH, United States
- Developer: Meta
- Status: operational
- Estimated cost: $15.6B
Meta Prometheus is a 1.1 GW AI data center project located in New Albany, OH, United States, currently operational. It is being built by Meta. The estimated build cost is $15.6B. This project is one of thousands of data-center facilities tracked by Data Center Index across OH, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Users: Meta; Epoch 'Current power' = 531 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Linked public companies
- Meta Platforms (META) — developer
- Meta Platforms (META) — tenant
- Eaton (ETN) — transformer switchgear
- Hubbell (HUBB) — electrical components
- ABB Ltd (ABBNY) — transformer switchgear
- Schneider Electric (SBGSF) — transformer ups
- Cummins (CMI) — genset
- Ciena Corp (CIEN) — interconnect
- Quanta Services (PWR) — electrical designer
- Broadcom (AVGO) — networking asic
- Micron Technology (MU) — memory supplier
- SK Hynix (000660.KS) — memory supplier