Google New Albany
543 MW AI data center in New Albany, OH, United States — operational.
- Capacity: 543 MW
- Location: New Albany, OH, United States
- Developer: Google
- Tenant: Google DeepMind
- Status: operational
- Estimated cost: $13.0B
Google New Albany is a 543 MW AI data center project located in New Albany, OH, United States, currently operational. It is being built by Google for tenant Google DeepMind. The estimated build cost is $13.0B. This project is one of thousands of data-center facilities tracked by Data Center Index across OH, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Users: Google DeepMind; Epoch 'Current power' = 407 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Google New Albany
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Alphabet (GOOGL) — developer · hyperscaler
- Alphabet (GOOGL) — tenant · hyperscaler
- ABB Ltd (ABBNY) — transformer switchgear · power equipment · mid DC exposure
- Schneider Electric (SBGSF) — transformer ups · power equipment · mid DC exposure
- Quanta Services (PWR) — electrical designer · construction · mid DC exposure
- Broadcom (AVGO) — networking asic · semiconductor
- Micron Technology (MU) — memory supplier · chip fab · high DC exposure
- SK Hynix (000660.KS) — memory supplier · chip fab · high DC exposure
- EMCOR Group (EME) — electrical designer · construction · mid DC exposure
- nVent Electric (NVT) — enclosures cooling · power equipment · high DC exposure
- Credo Technology (CRDO) — interconnect · networking · high DC exposure
- Lumentum Holdings (LITE) — optical transceiver · networking · high DC exposure
Related data center projects
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced
- Goodnight — 1.1 GW, Claude, TX, United States · operational
- Google Fort Wayne — 1.0 GW, Fort Wayne, IN, United States · under construction
- Gemini Cluster (Iowa) — 1.0 GW, Council Bluffs, IA, United States · operational
- Wilbarger Campus — 800 MW, Vernon, TX, United States · announced
- Google Cedar Rapids — 627 MW, IA 52404, IA, United States · operational
- Google-Kairos Power AI Data Center Initiative — 500 MW, Oak Ridge, United States · announced
- Google Omaha — 474 MW, Omaha, NE, United States · operational