Meta (META)
Meta Platforms (formerly Facebook) runs Facebook, Instagram and WhatsApp and builds and operates its own data center campuses for its apps and AI work.
- Type: Hyperscaler
- Ownership: Public company (META)
- Headquarters: Menlo Park, CA
- Founded: 2004
- Website: about.meta.com
- Ticker: META
- Projects tracked: 37
- Total pipeline: 12 GW
Projects
- Meta Hyperion, 5 GW, Richland Parish, LA, United States · under construction
- Meta–Vistra Nuclear Uprate Agreement (OH/PA), 2.6 GW, Perry, OH, United States · announced
- Meta Lebanon Data Center (Project Domino), 1 GW, Lebanon, IN, United States · under construction
- Meta El Paso, 1 GW, El Paso, TX, United States · under construction
- Meta Prometheus, 1 GW, New Albany, OH, United States · operational
- Crusoe Childress Campus, 1 GW, Childress County, TX, United States · under construction
- Meta-TerraPower Natrium Power Agreement, 690 MW, United States · announced
- Meta Altoona, Iowa AI Data Center Campus, 350 MW, Altoona, IA, United States · operational
- Meta Luleå, Sweden AI Data Center Campus, 300 MW, Luleå, Sweden · operational
- Meta Odense AI-Ready Data Center, 300 MW, Odense, Denmark · operational
- Meta Gallatin, 300 MW, Gallatin, TN, United States · operational
- Meta Clonee AI Data Center Campus, 288 MW, Clonee, Ireland · operational
- Beaver Dam DC, 220 MW, Beaver Dam, WI, United States · under construction
- Meta Kuna, 200 MW, Kuna ID 83634, ID, United States · operational
- Meta Aiken Data Center (Sage Mill Industrial Park), 200 MW, Aiken County, SC, United States · under construction
- Meta Forest City, North Carolina AI Data Center Campus, 200 MW, Forest City, NC, United States · operational
- Meta-QTS Hillsboro 2, 180 MW, Hillsboro, OR, United States · operational
- Meta Jeffersonville, 178 MW, Jeffersonville, IN, United States · under construction
- Meta Rosemount, 178 MW, Rosemount, MN, United States · under construction
- Meta Sarpy, 80 MW, Springfield, NE, United States · operational
- QTS Cedar Rapids, Cedar Rapids, IA, United States · under construction
- Meta Temple, Temple, TX, United States · operational
- Meta DeKalb Data Center, DeKalb, IL, United States · operational
- Reliance Jio Jamnagar AI Mega Campus, Jamnagar, India · under construction
- Meta Los Lunas, Los Lunas, NM, United States · operational
Frequently asked questions
- How many data centers does Meta have?
- Data Center Index tracks 37 data center campuses with Meta named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Meta have?
- 12 GW across 37 tracked campuses, counting operating and pipeline sites together. Of the 20 Meta campuses with a capacity figure, 0 are filed, 5 stated and 15 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Meta build data centers?
- Tracked Meta campuses sit in 27 markets: TX (5), OH (4), IA (3), AL (2), IN (2), OR (2), AZ (1), Denmark (1), and 19 more. The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Meta data center?
- Meta Hyperion in Richland Parish, LA is the largest tracked Meta campus at 5 GW, currently under construction. The developer or the press states that capacity, in a source dated July 13, 2026.