Meta Luleå, Sweden AI Data Center Campus
300 MW AI data center in Luleå, Sweden: operational.
- Capacity: 300 MW
- Location: Luleå, Sweden
- Developer: Meta
- Status: operational
- Energy source: Renewable
Meta Luleå, Sweden AI Data Center Campus is a 300 MW AI data center project located in Luleå, Sweden, currently operational. It is being built by Meta. Its energy source is listed as Renewable. This project is one of thousands of data-center facilities tracked by Data Center Index across Sweden, covering operational, under-construction, announced, and permitted sites.
Project description
Meta has run its Luleå campus in northern Sweden since 2013, tracked at 300 MW on renewable power. It now trains Llama models alongside Meta AI and content moderation workloads.
Public companies linked to Meta Luleå, Sweden AI Data Center Campus
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Meta Platforms (META), developer · hyperscaler
Related data center projects
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Meta–Vistra Nuclear Uprate Agreement (OH/PA), 2.1 GW, Perry, OH, United States · announced
- Meta Lebanon Data Center (Project Domino), 1 GW, Lebanon, IN, United States · under construction
- Meta El Paso, 1 GW, El Paso, TX, United States · under construction
- Meta Prometheus, 1 GW, New Albany, OH, United States · operational
- Meta DeKalb Data Center, 800 MW, DeKalb, IL, United States · operational
- Meta-TerraPower Natrium Power Agreement, 690 MW, United States · announced
- Meta Altoona, Iowa AI Data Center Campus, 350 MW, Altoona, IA, United States · operational
Frequently asked questions
- What is Meta Luleå, Sweden AI Data Center Campus?
- Meta Luleå, Sweden AI Data Center Campus is an AI data center project in Luleå, Sweden tracked by Data Center Index. Its status is operational.
- Where is Meta Luleå, Sweden AI Data Center Campus?
- Meta Luleå, Sweden AI Data Center Campus is in Luleå, Sweden.
- How big is Meta Luleå, Sweden AI Data Center Campus?
- Data Center Index tracks Meta Luleå, Sweden AI Data Center Campus at 300 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Meta Luleå, Sweden AI Data Center Campus?
- Meta is developing Meta Luleå, Sweden AI Data Center Campus.
- Which public companies are linked to Meta Luleå, Sweden AI Data Center Campus?
- Data Center Index links 1 tracked public company to Meta Luleå, Sweden AI Data Center Campus: Meta Platforms (META). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- AI Data Center Index facility profile: Meta Lulea Ai Data Center Sweden (aidci · aggregator · 2026-04-29)
- Meta (datacenters.atmeta.com · press · 2026-09-21)