Meta Los Lunas
87 MW AI data center in Los Lunas, NM, United States: operational.
- Capacity: 87 MW
- Location: Los Lunas, NM, United States
- Developer: Meta
- Status: operational
- Estimated cost: $2.5B
Meta Los Lunas is a 87 MW AI data center project located in Los Lunas, NM, United States, currently operational. It is being built by Meta. The estimated build cost is $2.5B. This project is one of thousands of data-center facilities tracked by Data Center Index across NM, United States, covering operational, under-construction, announced, and permitted sites.
Notes
Users: Meta; Epoch 'Current power' = 87 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Meta Los Lunas
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Meta Platforms (META), developer · hyperscaler
- Meta Platforms (META), tenant · hyperscaler
Related data center projects
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Meta–Vistra Nuclear Uprate Agreement (OH/PA), 2.1 GW, Perry, OH, United States · announced
- Meta Lebanon Data Center (Project Domino), 1 GW, Lebanon, IN, United States · under construction
- Meta El Paso, 1 GW, El Paso, TX, United States · under construction
- Meta Prometheus, 1 GW, New Albany, OH, United States · operational
- Meta DeKalb Data Center, 800 MW, DeKalb, IL, United States · operational
- Meta-TerraPower Natrium Power Agreement, 690 MW, United States · announced
- Meta Altoona, Iowa AI Data Center Campus, 350 MW, Altoona, IA, United States · operational
Frequently asked questions
- What is Meta Los Lunas?
- Meta Los Lunas is an AI data center project in Los Lunas, New Mexico tracked by Data Center Index. Its status is operational, and it is still adding buildings.
- Where is Meta Los Lunas?
- Meta Los Lunas is in Los Lunas, New Mexico. Every tracked New Mexico campus, with counts and capacity, is at https://datacenterindex.ai/markets/new-mexico.
- How big is Meta Los Lunas?
- Data Center Index tracks Meta Los Lunas at 87 MW, on an estimated $2.5B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Meta Los Lunas?
- Meta is developing Meta Los Lunas.
- When will Meta Los Lunas come online?
- Meta Los Lunas is already operating. The next building is expected to go live October 26, 2026.
- Which public companies are linked to Meta Los Lunas?
- Data Center Index links 2 tracked public companies to Meta Los Lunas: Meta Platforms (META), Meta Platforms (META). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Santa Fe New Mexican (santafenewmexican.com · press · 2025-07-13)
- Meta Los Lunas | AI Data Centers (epoch.ai · aggregator · 2026-09-11)
- Meta Los Lunas Data Center fact sheet (datacenters.atmeta.com · press · 2026-09-02)
- KOB 4 (kob.com · press · 2025-07-13)