Meta Altoona, Iowa AI Data Center Campus
350 MW AI data center in Altoona, IA, United States: operational.
- Capacity: 350 MW
- Location: Altoona, IA, United States
- Developer: Meta
- Status: operational
- Energy source: Renewable
Meta Altoona, Iowa AI Data Center Campus is a 350 MW AI data center project located in Altoona, IA, United States, currently operational. It is being built by Meta. Its energy source is listed as Renewable. This project is one of thousands of data-center facilities tracked by Data Center Index across IA, United States, covering operational, under-construction, announced, and permitted sites.
Public companies linked to Meta Altoona, Iowa AI Data Center Campus
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Meta Platforms (META), developer · hyperscaler
Related data center projects
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Meta–Vistra Nuclear Uprate Agreement (OH/PA), 2.1 GW, Perry, OH, United States · announced
- Meta Lebanon Data Center (Project Domino), 1 GW, Lebanon, IN, United States · under construction
- Meta El Paso, 1 GW, El Paso, TX, United States · under construction
- Meta Prometheus, 1 GW, New Albany, OH, United States · operational
- Meta DeKalb Data Center, 800 MW, DeKalb, IL, United States · operational
- Meta-TerraPower Natrium Power Agreement, 690 MW, United States · announced
- Meta Luleå, Sweden AI Data Center Campus, 300 MW, Luleå, Sweden · operational
Frequently asked questions
- What is Meta Altoona, Iowa AI Data Center Campus?
- Meta Altoona, Iowa AI Data Center Campus is an AI data center project in Altoona, Iowa tracked by Data Center Index. Its status is operational.
- Where is Meta Altoona, Iowa AI Data Center Campus?
- Meta Altoona, Iowa AI Data Center Campus is in Altoona, Iowa. Every tracked Iowa campus, with counts and capacity, is at https://datacenterindex.ai/markets/iowa.
- How big is Meta Altoona, Iowa AI Data Center Campus?
- Data Center Index tracks Meta Altoona, Iowa AI Data Center Campus at 350 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Meta Altoona, Iowa AI Data Center Campus?
- Meta is developing Meta Altoona, Iowa AI Data Center Campus.
- Which public companies are linked to Meta Altoona, Iowa AI Data Center Campus?
- Data Center Index links 1 tracked public company to Meta Altoona, Iowa AI Data Center Campus: Meta Platforms (META). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Meta (data center info sheet) (datacenters.atmeta.com · press · 2026-09-21)
- Data Center Frontier (datacenterfrontier.com · press · 2026-09-12)