Iowa Data Centers
Live tracking of every data center project in Iowa — operational, under construction, announced, and permitted — with developer, tenant, capacity, and supply-chain links.
- Operating: 4
- Under construction: 3
- Announced: 1
- Operating capacity: 1.9 GW
- Pipeline capacity: 2.0 GW
- Grid: MISO
Iowa is a Google state first: Council Bluffs hosts a 1 GW Gemini training cluster plus a 284 MW campus, and Cedar Rapids adds another 314 MW. QTS's Cedar Rapids campus in Fairfax is the largest single row at 1.59 GW, Meta operates 350 MW in Altoona, and NextEra's proposed 615 MW restart of the Duane Arnold nuclear plant in Palo is the power story to watch on MISO.
Data Center Index tracks 8 named data center campuses in Iowa (large sites with a source, not every building): 4 operating, 3 under construction, and 1 announced or permitted. The pipeline adds up to 2.0 GW of planned capacity. The grid is operated by MISO, which runs the interconnection queue. Below: every tracked project in Iowa, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Iowa
- Google Council Bluffs (East) — 284 MW, Council Bluffs · operational · developer: Google · tenant: Google DeepMind · ~$9.0B
- Microsoft Project Osmium — 228 MW, West Des Moines · operational · developer: Microsoft · tenant: OpenAI · ~$7.2B
- Gemini Cluster (Iowa) — 1.0 GW, Council Bluffs · operational · developer: Google
- Meta — Altoona, Iowa AI Data Center Campus — 350 MW, Altoona · operational · developer: Meta
- QTS Cedar Rapids — 1.1 GW, Fairfax · under construction · developer: QTS Data Centers
- Google Cedar Rapids — 314 MW, Cedar Rapids · under construction · developer: Google · tenant: Google DeepMind
- Microsoft West Des Moines (Project Ginger West), West Des Moines · under construction · developer: Microsoft
- NextEra Energy's Duane Arnold Nuclear Plant Reactivation — 615 MW, Palo · announced · developer: NextEra Energy
- Google Palo (Linn County) Data Center, Palo · announced · developer: Google
Frequently asked questions
- How many data centers are in Iowa?
- Data Center Index tracks 8 named data center campuses in Iowa as of 2026: 4 operating, 3 under construction, and 1 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Iowa have?
- 1.9 GW is operating, with 2.0 GW in the announced and under-construction pipeline. 7 of the 7 Iowa campuses carrying a capacity figure show an estimate rather than a figure a named source states, marked "est." on the site.
- What is the largest data center in Iowa?
- QTS Cedar Rapids in Fairfax is the largest tracked campus in Iowa at 1.1 GW, developed by QTS Data Centers. That capacity is an estimate, not a figure a named source states.
- Who is building data centers in Iowa?
- The most active developers in Iowa by tracked campus count are Google (4 campuses), Microsoft (2 campuses), Meta (1 campus). Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves Iowa data centers?
- MISO runs the grid and the interconnection queue for Iowa, so new campus power requests are approved on its timeline.
Public companies exposed to Iowa
These public companies have tracked data-center projects in Iowa as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Alphabet (GOOGL) — hyperscaler · 3 projects in Iowa
- SK Hynix (000660.KS) — chip fab · 1 project in Iowa
- Cummins (CMI) — power equipment · 1 project in Iowa
- Jacobs Solutions (J) — construction · 1 project in Iowa
- Lumentum Holdings (LITE) — networking · 1 project in Iowa
- Meta Platforms (META) — hyperscaler · 1 project in Iowa
- Microsoft (MSFT) — hyperscaler · 1 project in Iowa
- Micron Technology (MU) — chip fab · 1 project in Iowa
- NextEra Energy (NEE) — energy · 1 project in Iowa
- nVent Electric (NVT) — power equipment · 1 project in Iowa
- OpenAI (OPENAI) — ai lab · 1 project in Iowa
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers — 55 tracked projects, 63.3 GW pipeline
- Utah data centers — 7 tracked projects, 21.1 GW pipeline
- Pennsylvania data centers — 16 tracked projects, 15.7 GW pipeline
- Ohio data centers — 25 tracked projects, 13.3 GW pipeline
- Virginia data centers — 34 tracked projects, 9.8 GW pipeline
- Kentucky data centers — 8 tracked projects, 8.9 GW pipeline
- Georgia data centers — 26 tracked projects, 8.1 GW pipeline
- Wyoming data centers — 7 tracked projects, 6.1 GW pipeline
- West Virginia data centers — 4 tracked projects, 6.1 GW pipeline
- Florida data centers — 7 tracked projects, 5.9 GW pipeline
- Illinois data centers — 13 tracked projects, 5.5 GW pipeline
- Maryland data centers — 8 tracked projects, 5.3 GW pipeline
- Indiana data centers — 11 tracked projects, 5.0 GW pipeline
- Kansas data centers — 10 tracked projects, 4.5 GW pipeline
- Arizona data centers — 24 tracked projects, 4.4 GW pipeline
- Oklahoma data centers — 12 tracked projects, 4.2 GW pipeline
- North Carolina data centers — 15 tracked projects, 4.1 GW pipeline
- Alabama data centers — 9 tracked projects, 3.4 GW pipeline
- Nebraska data centers — 7 tracked projects, 3.1 GW pipeline
- Louisiana data centers — 8 tracked projects, 3.0 GW pipeline
- Michigan data centers — 9 tracked projects, 2.6 GW pipeline
- Arkansas data centers — 7 tracked projects, 2.5 GW pipeline
- Oregon data centers — 13 tracked projects, 2.5 GW pipeline
- New York data centers — 7 tracked projects, 2.3 GW pipeline
- South Carolina data centers — 8 tracked projects, 1.9 GW pipeline
- Missouri data centers — 6 tracked projects, 1.7 GW pipeline
- Nevada data centers — 10 tracked projects, 1.6 GW pipeline
- Wisconsin data centers — 4 tracked projects, 1.5 GW pipeline
- California data centers — 15 tracked projects, 1.4 GW pipeline
- North Dakota data centers — 4 tracked projects, 1.4 GW pipeline
- Delaware data centers — 1 tracked project, 1.2 GW pipeline
- Montana data centers — 2 tracked projects, 1.1 GW pipeline
- Washington data centers — 5 tracked projects, 1.0 GW pipeline
- Colorado data centers — 4 tracked projects, 800 MW pipeline
- Mississippi data centers — 7 tracked projects, 616 MW pipeline
- Minnesota data centers — 4 tracked projects, 600 MW pipeline
- New Jersey data centers — 3 tracked projects, 550 MW pipeline
- South Dakota data centers — 2 tracked projects, 500 MW pipeline
- Massachusetts data centers — 1 tracked project, 274 MW pipeline
- Idaho data centers — 3 tracked projects, 240 MW pipeline
- Tennessee data centers — 7 tracked projects, 110 MW pipeline
- Connecticut data centers — 1 tracked project, 100 MW pipeline
- New Mexico data centers — 2 tracked projects