Tract
Data center land acquisition and development company that assembles master-planned parks with power and fiber for hyperscale users. Led by Grant van Rooyen; backers include Berkshire Partners and Columbia Capital.
- Type: Hyperscale campus developer
- Ownership: Private, backed by Tract Capital Management
- Headquarters: Denver, CO
- Website: tract.com
- Projects tracked: 11
- Total pipeline: 12.3 GW
Projects
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
- Tract Hanover Technology Park, 2.4 GW, Ashland, VA, United States · permitted
- Tract Buckeye Technology Park, 1.8 GW, Buckeye, AZ, United States · permitted
- Tract Eagle Mountain (Pole Canyon), 1.7 GW, Eagle Mountain, UT, United States · announced
- Tract Tuckahoe Technology Park (Goochland), 900 MW, Goochland, VA, United States · announced
- Tract Peru Shelf Technology Park, 810 MW, McCarran, NV, United States · permitted
- Tract Sapphire Technology Park, 700 MW, Silver Springs, NV, United States · permitted
- Tract Farmington Technology Park, Farmington, MN, United States · permitted
- Haven Oak Technology Park, Dinwiddie, VA, United States · announced
- Tract Cannon Falls Technology Park, Cannon Falls, MN, United States · permitted
- Tract Project West (Norwalk), Norwalk, IA, United States · announced
Frequently asked questions
- How many data centers does Tract have?
- Data Center Index tracks 11 data center campuses with Tract named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Tract have?
- 12.3 GW across 11 tracked campuses, counting operating and pipeline sites together. Of the 7 Tract campuses with a capacity figure, 0 are filed, 5 stated and 2 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Tract build data centers?
- Tracked Tract campuses sit in 7 markets: VA (3), MN (2), NV (2), AZ (1), IA (1), TX (1), UT (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Tract data center?
- Tract Caldwell Valley Technology Park in Uhland, TX is the largest tracked Tract campus at 4 GW, currently announced. The developer or the press states that capacity, in a source dated September 18, 2026.