Tract Eagle Mountain (Pole Canyon)
1.7 GW AI data center in Eagle Mountain, UT, United States: announced.
- Capacity: 1.7 GW
- Location: Eagle Mountain, UT, United States
- Developer: Tract
- Status: announced
- Estimated cost: $7B
Tract Eagle Mountain (Pole Canyon) is a 1.7 GW AI data center project located in Eagle Mountain, UT, United States, currently announced. It is being built by Tract. The estimated build cost is $7B. This project is one of thousands of data-center facilities tracked by Data Center Index across UT, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Tract acquired 668+ acres west of Utah Lake for a master-planned park. The land sits in Eagle Mountain's Regional Technology Innovation overlay zone, where data center use is by-right, and new transmission infrastructure is targeted to deliver 400+ MW by 2028.
Related data center projects
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
- Tract Hanover Technology Park, 2.4 GW, Ashland, VA, United States · permitted
- Tract Buckeye Technology Park, 1.8 GW, Buckeye, AZ, United States · permitted
- Tract Tuckahoe Technology Park (Goochland), 900 MW, Goochland, VA, United States · announced
- Tract Farmington Technology Park, Farmington, MN, United States · permitted
- Haven Oak Technology Park, Dinwiddie, VA, United States · announced
- Tract Cannon Falls Technology Park, Cannon Falls, MN, United States · permitted
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
Frequently asked questions
- What is Tract Eagle Mountain (Pole Canyon)?
- Tract Eagle Mountain (Pole Canyon) is an AI data center project in Eagle Mountain, Utah tracked by Data Center Index. Its status is announced.
- Where is Tract Eagle Mountain (Pole Canyon)?
- Tract Eagle Mountain (Pole Canyon) is in Eagle Mountain, Utah. Every tracked Utah campus, with counts and capacity, is at https://datacenterindex.ai/markets/utah.
- How big is Tract Eagle Mountain (Pole Canyon)?
- Data Center Index tracks Tract Eagle Mountain (Pole Canyon) at 1.7 GW, on an estimated $7B build. The developer or the press states that capacity, in a source dated September 23, 2026.
- Who is building Tract Eagle Mountain (Pole Canyon)?
- Tract is developing Tract Eagle Mountain (Pole Canyon).
- When will Tract Eagle Mountain (Pole Canyon) come online?
- The next building at Tract Eagle Mountain (Pole Canyon) is expected online 2028. That date is the first building going live, not the full build-out.
Sources
- Colorado-based company acquires land for another data center in Eagle Mountain (ksl.com · press · 2024-01-24)
- Tract (tract.com · press · 2026-09-23)
- EDCUtah (edcutah.org · press · 2024-01-18)
- Data Center Dynamics (datacenterdynamics.com · press · 2026-09-12)