Edged Council Bluffs Campus (Project Lola)

200 MW AI data center in Council Bluffs, IA, United States: under construction.

Edged Council Bluffs Campus (Project Lola) is a 200 MW AI data center project located in Council Bluffs, IA, United States, currently under construction. It is being built by Edged. This project is one of thousands of data-center facilities tracked by Data Center Index across IA, United States, covering operational, under-construction, announced, and permitted sites.

Project description

Edged has topped out both buildings, OMA01-1 and OMA01-2, at its Council Bluffs campus at College Road and East Kanesville Boulevard, which is designed for up to 200 MW; ground was broken in October 2025.

Related data center projects

Frequently asked questions

What is Edged Council Bluffs Campus (Project Lola)?
Edged Council Bluffs Campus (Project Lola) is an AI data center project in Council Bluffs, Iowa tracked by Data Center Index. Its status is under construction.
Where is Edged Council Bluffs Campus (Project Lola)?
Edged Council Bluffs Campus (Project Lola) is in Council Bluffs, Iowa. Every tracked Iowa campus, with counts and capacity, is at https://datacenterindex.ai/markets/iowa.
How big is Edged Council Bluffs Campus (Project Lola)?
Data Center Index tracks Edged Council Bluffs Campus (Project Lola) at 200 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
Who is building Edged Council Bluffs Campus (Project Lola)?
Edged is developing Edged Council Bluffs Campus (Project Lola).

Sources

  1. Edged US Tops Out Two Data Centers in Council Bluffs (blackridgeresearch.com · press · 2026-09-13)
  2. Data Center Dynamics (datacenterdynamics.com · press · 2026-09-13)