Edged Council Bluffs Campus (Project Lola)
200 MW AI data center in Council Bluffs, IA, United States: under construction.
- Capacity: 200 MW
- Location: Council Bluffs, IA, United States
- Developer: Edged
- Status: under construction
Edged Council Bluffs Campus (Project Lola) is a 200 MW AI data center project located in Council Bluffs, IA, United States, currently under construction. It is being built by Edged. This project is one of thousands of data-center facilities tracked by Data Center Index across IA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Edged has topped out both buildings, OMA01-1 and OMA01-2, at its Council Bluffs campus at College Road and East Kanesville Boulevard, which is designed for up to 200 MW; ground was broken in October 2025.
Related data center projects
- Edged Austin (Maxwell), Maxwell, TX, United States · permitted
- Stratos Hyperscale Data Center, 9 GW, Snowville, UT, United States · announced
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
Frequently asked questions
- What is Edged Council Bluffs Campus (Project Lola)?
- Edged Council Bluffs Campus (Project Lola) is an AI data center project in Council Bluffs, Iowa tracked by Data Center Index. Its status is under construction.
- Where is Edged Council Bluffs Campus (Project Lola)?
- Edged Council Bluffs Campus (Project Lola) is in Council Bluffs, Iowa. Every tracked Iowa campus, with counts and capacity, is at https://datacenterindex.ai/markets/iowa.
- How big is Edged Council Bluffs Campus (Project Lola)?
- Data Center Index tracks Edged Council Bluffs Campus (Project Lola) at 200 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Edged Council Bluffs Campus (Project Lola)?
- Edged is developing Edged Council Bluffs Campus (Project Lola).
Sources
- Edged US Tops Out Two Data Centers in Council Bluffs (blackridgeresearch.com · press · 2026-09-13)
- Data Center Dynamics (datacenterdynamics.com · press · 2026-09-13)