Edged Chicago Campus Aurora (ORD01)
96 MW AI data center in Aurora, IL, United States: operational.
Updated
- Capacity: 96 MW
- Location: Aurora, IL, United States
- Developer: Edged
- Status: operational
Edged Chicago Campus Aurora (ORD01) is a 96 MW AI data center project located in Aurora, IL, United States, currently operational. It was developed by Edged. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Illinois.
Project description
Edged's location page lists 96 MW of critical load across ORD01-1 (24 MW) and ORD01-2 (72 MW) at 2835 Bilter Road, Aurora. Edged's June 4, 2026 release says the first facility opened in February 2025 and the second topped out, due operational in Q2 2027.
Related data center projects
- Edged Council Bluffs Campus (Project Lola), 200 MW, Council Bluffs, IA, United States · under construction
- Edged Fort Worth Data Center (Team Rockbrook Parkway), 196 MW, Fort Worth, TX, United States · announced
- Edged Atlanta Campus (ATL01), 168 MW, Atlanta, GA, United States · operational
- Edged Phoenix Campus Mesa (PHX01), 36 MW, Mesa, AZ, United States · operational
- Edged Kansas City Campus (MCI01), 26 MW, Kansas City, MO, United States · operational
- Edged Columbus Campus New Albany (CMH01), 24 MW, New Albany, OH, United States · operational
- Edged Des Moines Campus Ankeny, 13 MW, Ankeny, IA, United States · under construction
- Edged Austin (Maxwell), Maxwell, TX, United States · permitted
Frequently asked questions
- What is Edged Chicago Campus Aurora (ORD01)?
- Edged Chicago Campus Aurora (ORD01) is an AI data center project in Aurora, Illinois tracked by Data Center Index. Its status is operational.
- Where is Edged Chicago Campus Aurora (ORD01)?
- Edged Chicago Campus Aurora (ORD01) is in Aurora, Illinois. Every tracked Illinois campus, with counts and capacity, is at https://datacenterindex.ai/markets/illinois.
- How big is Edged Chicago Campus Aurora (ORD01)?
- Data Center Index tracks Edged Chicago Campus Aurora (ORD01) at 96 MW. The developer or the press states that capacity, in a source dated November 18, 2026.
- Who is building Edged Chicago Campus Aurora (ORD01)?
- Edged is developing Edged Chicago Campus Aurora (ORD01).
Sources
- Edged Chicago (edged.us · press · 2026-11-18)
- Edged (edged.us · press · 2026-11-18)