Edged
Tracked AI data center portfolio for Edged: live capex history, supplier exposure, and project map.
- Projects tracked: 2
- Total pipeline: 200 MW
Projects
- Edged Council Bluffs Campus (Project Lola), 200 MW, Council Bluffs, IA, United States · under construction
- Edged Austin (Maxwell), Maxwell, TX, United States · permitted
Frequently asked questions
- How many data centers does Edged have?
- Data Center Index tracks 2 data center campuses with Edged named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Edged have?
- 200 MW across 2 tracked campuses, counting operating and pipeline sites together. Of the 1 Edged campus with a capacity figure, 0 are filed, 0 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Edged build data centers?
- Tracked Edged campuses sit in 2 markets: IA (1), TX (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Edged data center?
- Edged Council Bluffs Campus (Project Lola) in IA is the largest tracked Edged campus at 200 MW, currently under construction. That capacity is an estimate. We modeled or inferred it, and no source states it.