Edged Phoenix Campus Mesa (PHX01)
36 MW AI data center in Mesa, AZ, United States: operational.
Updated
- Capacity: 36 MW
- Location: Mesa, AZ, United States
- Developer: Edged
- Status: operational
Edged Phoenix Campus Mesa (PHX01) is a 36 MW AI data center project located in Mesa, AZ, United States, currently operational. It was developed by Edged. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Arizona.
Project description
Edged's location page lists 36 MW of critical load at 8807 E. Warner Rd, Mesa on a 12-acre site. IT Brief (April 7, 2026) reports Edged US has opened a 36 MW data centre in Mesa, Arizona.
Related data center projects
- Edged Council Bluffs Campus (Project Lola), 200 MW, Council Bluffs, IA, United States · under construction
- Edged Fort Worth Data Center (Team Rockbrook Parkway), 196 MW, Fort Worth, TX, United States · announced
- Edged Atlanta Campus (ATL01), 168 MW, Atlanta, GA, United States · operational
- Edged Chicago Campus Aurora (ORD01), 96 MW, Aurora, IL, United States · operational
- Edged Kansas City Campus (MCI01), 26 MW, Kansas City, MO, United States · operational
- Edged Columbus Campus New Albany (CMH01), 24 MW, New Albany, OH, United States · operational
- Edged Des Moines Campus Ankeny, 13 MW, Ankeny, IA, United States · under construction
- Edged Austin (Maxwell), Maxwell, TX, United States · permitted
Frequently asked questions
- What is Edged Phoenix Campus Mesa (PHX01)?
- Edged Phoenix Campus Mesa (PHX01) is an AI data center project in Mesa, Arizona tracked by Data Center Index. Its status is operational.
- Where is Edged Phoenix Campus Mesa (PHX01)?
- Edged Phoenix Campus Mesa (PHX01) is in Mesa, Arizona. Every tracked Arizona campus, with counts and capacity, is at https://datacenterindex.ai/markets/arizona.
- How big is Edged Phoenix Campus Mesa (PHX01)?
- Data Center Index tracks Edged Phoenix Campus Mesa (PHX01) at 36 MW. The developer or the press states that capacity, in a source dated November 18, 2026.
- Who is building Edged Phoenix Campus Mesa (PHX01)?
- Edged is developing Edged Phoenix Campus Mesa (PHX01).
Sources
- Edged Phoenix (edged.us · press · 2026-11-18)
- IT Brief (itbrief.news · press · 2026-11-18)