Google Council Bluffs (East)
284 MW AI data center in Council Bluffs, IA, United States — operational.
- Capacity: 284 MW
- Location: Council Bluffs, IA, United States
- Developer: Google
- Tenant: Google DeepMind
- Status: operational
- Estimated cost: $6.0B
Google Council Bluffs (East) is a 284 MW AI data center project located in Council Bluffs, IA, United States, currently operational. It is being built by Google for tenant Google DeepMind. The estimated build cost is $6.0B. This project is one of thousands of data-center facilities tracked by Data Center Index across IA, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Users: Google DeepMind; Epoch 'Current power' = 190 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Google Council Bluffs (East)
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Alphabet (GOOGL) — developer · hyperscaler
- Alphabet (GOOGL) — tenant · hyperscaler
- Cummins (CMI) — genset · power equipment · mid DC exposure
- Micron Technology (MU) — memory supplier · chip fab · high DC exposure
- SK Hynix (000660.KS) — memory supplier · chip fab · high DC exposure
- nVent Electric (NVT) — enclosures cooling · power equipment · high DC exposure
- Lumentum Holdings (LITE) — optical transceiver · networking · high DC exposure
Related data center projects
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced
- Goodnight — 1.1 GW, Claude, TX, United States · operational
- Google Fort Wayne — 1.0 GW, Fort Wayne, IN, United States · under construction
- Gemini Cluster (Iowa) — 1.0 GW, Council Bluffs, IA, United States · operational
- Wilbarger Campus — 800 MW, Vernon, TX, United States · announced
- Google Cedar Rapids — 627 MW, IA 52404, IA, United States · operational
- Google New Albany — 543 MW, New Albany, OH, United States · operational
- Google-Kairos Power AI Data Center Initiative — 500 MW, Oak Ridge, United States · announced