Applied Digital Adair Data Center
200 MW AI data center in Adair, IA, United States: announced.
- Capacity: 200 MW
- Location: Adair, IA, United States
- Developer: Applied Digital
- Status: announced
Applied Digital Adair Data Center is a 200 MW AI data center project located in Adair, IA, United States, currently announced. It is being built by Applied Digital. This project is one of thousands of data-center facilities tracked by Data Center Index across IA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Applied Digital representatives told the Adair County supervisors they are working on a site in Adair for a 200 MW data center, starting with a 300,000 sq ft building, at a construction cost of $1 billion to $1.5 billion.
Related data center projects
- Applied Digital Deuel County Campus (Toronto), 430 MW, Toronto, SD, United States · cancelled
- Applied Digital Polaris Forge 1 (Ellendale), 400 MW, Ellendale, ND, United States · operational
- Applied Digital Delta Forge 1, 300 MW, Boyce, LA, United States · under construction
- Applied Digital Polaris Forge 2 (Harwood), 300 MW, Harwood, ND, United States · under construction
- Applied Digital Polaris Forge 3, 300 MW, Center, ND, United States · under construction
- Applied Digital Brookwood, 210 MW, Brookwood, AL, United States · permitted
- Applied Digital Garden City, 200 MW, Garden City, TX, United States · operational
- Applied Digital Ellendale Hosting Facility, 180 MW, Ellendale, ND, United States · operational
Frequently asked questions
- What is Applied Digital Adair Data Center?
- Applied Digital Adair Data Center is an AI data center project in Adair, Iowa tracked by Data Center Index. Its status is announced.
- Where is Applied Digital Adair Data Center?
- Applied Digital Adair Data Center is in Adair, Iowa. Every tracked Iowa campus, with counts and capacity, is at https://datacenterindex.ai/markets/iowa.
- How big is Applied Digital Adair Data Center?
- Data Center Index tracks Applied Digital Adair Data Center at 200 MW. A permit, utility filing or SEC filing states that capacity, in a source dated April 2, 2024.
- Who is building Applied Digital Adair Data Center?
- Applied Digital is developing Applied Digital Adair Data Center.
Sources
- Adair County Board of Supervisors minutes, April 2, 2024 (adaircounty.iowa.gov · public record · 2024-04-02)