Applied Digital Polaris Forge 1 (Ellendale)

400 MW AI data center in Ellendale, ND, United States: operational.

Applied Digital Polaris Forge 1 (Ellendale) is a 400 MW AI data center project located in Ellendale, ND, United States, currently operational. It is being built by Applied Digital for tenant CoreWeave. The estimated build cost is $5B. Its energy source is listed as Renewable-power design intent and cool-climate efficiency. This project is one of thousands of data-center facilities tracked by Data Center Index across ND, United States, covering operational, under-construction, announced, and permitted sites.

Notes

Users: OpenAI; Epoch 'Current power' = 68 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI

Public companies linked to Applied Digital Polaris Forge 1 (Ellendale)

Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:

Related data center projects

Frequently asked questions

What is Applied Digital Polaris Forge 1 (Ellendale)?
Applied Digital Polaris Forge 1 (Ellendale) is an AI data center project in Ellendale, North Dakota tracked by Data Center Index. Its status is operational, and it is still adding buildings.
Where is Applied Digital Polaris Forge 1 (Ellendale)?
Applied Digital Polaris Forge 1 (Ellendale) is in Ellendale, North Dakota. Every tracked North Dakota campus, with counts and capacity, is at https://datacenterindex.ai/markets/north-dakota.
How big is Applied Digital Polaris Forge 1 (Ellendale)?
Data Center Index tracks Applied Digital Polaris Forge 1 (Ellendale) at 400 MW, on an estimated $5B build. 250 MW of that is live today. The developer or the press states that capacity, in a source dated July 1, 2026.
Who is building Applied Digital Polaris Forge 1 (Ellendale)?
Applied Digital is developing Applied Digital Polaris Forge 1 (Ellendale), with CoreWeave named as the tenant.
When will Applied Digital Polaris Forge 1 (Ellendale) come online?
Applied Digital Polaris Forge 1 (Ellendale) is already operating. The next building is expected to go live December 31, 2026.
Which public companies are linked to Applied Digital Polaris Forge 1 (Ellendale)?
Data Center Index links 1 tracked public company to Applied Digital Polaris Forge 1 (Ellendale): CoreWeave (CRWV). Each is a developer, tenant or supplier with a sourced link to the project.

Sources

  1. Applied Digital Delivers Second Building at Polaris Forge 1 (ir.applieddigital.com · press · 2026-07-01)
  2. Century Builders (site contractor) (centurybuildersnd.com · press · 2026-04-01)
  3. Applied Digital delivers second building at Polaris Forge 1 (globenewswire.com · press · 2026-07-01)
  4. Applied Digital (ir.applieddigital.com · press · 2026-07-01)
  5. North Dakota town serves as an example of the promise and perils of data centers for South Dakota (southdakotasearchlight.com · press · 2026-01-30)
  6. Applied Digital (SEC 8-K Ex. 99.1) (sec.gov · filing · 2025-08-29)
  7. Applied Digital Brings an Additional 75 MW of AI Infrastructure Online at Polaris Forge 1 (ir.applieddigital.com · press · 2026-10-02)
  8. Applied Digital IR (ir.applieddigital.com · press · 2026-04-01)