Applied Digital Delta Forge 1
430 MW AI data center in Boyce, LA, United States — under construction.
- Capacity: 430 MW
- Location: Boyce, LA, United States
- Developer: Applied Digital
- Tenant: Unnamed US investment-grade hyperscaler
- Status: under construction
- Estimated cost: $3.6B
Applied Digital Delta Forge 1 is a 430 MW AI data center project located in Boyce, LA, United States, currently under construction. It is being built by Applied Digital for tenant Unnamed US investment-grade hyperscaler. The estimated build cost is $3.6B. This project is one of thousands of data-center facilities tracked by Data Center Index across LA, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Applied Digital signed a ~15-year lease covering 300 MW of critical IT load (~$7.5B total contracted value) with a US hyperscaler at its 430 MW AI Factory campus Delta Forge 1, spanning more than 500 acres; initial operations anticipated to commence in mid-2027.
Related data center projects
- Applied Digital Polaris Forge 2 (Harwood) — 280 MW, Harwood, ND, United States · under construction
- Applied Digital Brookwood, Brookwood, AL, United States · announced
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced