Louisiana Data Centers
Live tracking of every data center project in Louisiana — operational, under construction, announced, and permitted — with developer, tenant, capacity, and supply-chain links.
- Operating: 0
- Under construction: 5
- Announced: 3
- Pipeline capacity: 3.0 GW
- Grid: MISO
Louisiana's tracker is one project: Meta's Hyperion campus in Richland Parish, planned at 5 GW with the first 2.26 GW listed as operating. The linked suppliers tell the power story, with GE Vernova, Caterpillar, and Arista among the ten public companies tied to the build on MISO.
Data Center Index tracks 8 named data center campuses in Louisiana (large sites with a source, not every building): 0 operating, 5 under construction, and 3 announced or permitted. The pipeline adds up to 3.0 GW of planned capacity. The grid is operated by MISO, which runs the interconnection queue. Below: every tracked project in Louisiana, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Louisiana
- Hut 8 River Bend AI Campus — 330 MW, West Feliciana Parish · under construction · developer: Hut 8 · tenant: Fluidstack · ~$10.0B
- AWS / STACK Bossier Parish Campus (Benton), Benton · under construction · developer: STACK Infrastructure · tenant: Amazon Web Services · ~$6.0B
- Applied Digital Delta Forge 1 — 430 MW, Boyce · under construction · developer: Applied Digital · tenant: Unnamed US investment-grade hyperscaler · ~$3.6B
- Meta Hyperion — 2.3 GW, Holly Ridge · under construction · developer: Meta
- AWS / STACK Caddo Parish Campus (Stateline Road, Blanchard), Blanchard · under construction · developer: STACK Infrastructure · tenant: Amazon Web Services
- AWS / STACK Shreveport Campus (Resilient Technology Park), Shreveport · announced · developer: STACK Infrastructure · tenant: Amazon Web Services · ~$6.0B
- ONE Nuclear Project Cayman Data Center Campus, Ascension Parish · announced · developer: ONE Nuclear Energy
- Azimuth Renewables Moss Bluff Data Center (proposed), Moss Bluff · announced · developer: Azimuth Renewables
Frequently asked questions
- How many data centers are in Louisiana?
- Data Center Index tracks 8 named data center campuses in Louisiana as of 2026: 0 operating, 5 under construction, and 3 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Louisiana have?
- No operating capacity is published, with 3.0 GW in the announced and under-construction pipeline. 2 of the 3 Louisiana campuses carrying a capacity figure show an estimate rather than a figure a named source states, marked "est." on the site.
- What is the largest data center in Louisiana?
- Meta Hyperion in Holly Ridge is the largest tracked campus in Louisiana at 2.3 GW, developed by Meta. That capacity is an estimate, not a figure a named source states.
- Who is building data centers in Louisiana?
- The most active developers in Louisiana by tracked campus count are STACK Infrastructure (3 campuses), Hut 8 (1 campus), Applied Digital (1 campus). Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves Louisiana data centers?
- MISO runs the grid and the interconnection queue for Louisiana, so new campus power requests are approved on its timeline.
Public companies exposed to Louisiana
These public companies have tracked data-center projects in Louisiana as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- SK Hynix (000660.KS) — chip fab · 1 project in Louisiana
- Arista Networks (ANET) — networking · 1 project in Louisiana
- Broadcom (AVGO) — semiconductor · 1 project in Louisiana
- Caterpillar (CAT) — power equipment · 1 project in Louisiana
- Coherent Corp (COHR) — networking · 1 project in Louisiana
- GE Vernova (GEV) — power equipment · 1 project in Louisiana
- Lumentum Holdings (LITE) — networking · 1 project in Louisiana
- Meta Platforms (META) — hyperscaler · 1 project in Louisiana
- Modine Manufacturing (MOD) — cooling · 1 project in Louisiana
- Micron Technology (MU) — chip fab · 1 project in Louisiana
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers — 55 tracked projects, 63.3 GW pipeline
- Utah data centers — 7 tracked projects, 21.1 GW pipeline
- Pennsylvania data centers — 16 tracked projects, 15.7 GW pipeline
- Ohio data centers — 25 tracked projects, 13.3 GW pipeline
- Virginia data centers — 34 tracked projects, 9.8 GW pipeline
- Kentucky data centers — 8 tracked projects, 8.9 GW pipeline
- Georgia data centers — 26 tracked projects, 8.1 GW pipeline
- Wyoming data centers — 7 tracked projects, 6.1 GW pipeline
- West Virginia data centers — 4 tracked projects, 6.1 GW pipeline
- Florida data centers — 7 tracked projects, 5.9 GW pipeline
- Illinois data centers — 13 tracked projects, 5.5 GW pipeline
- Maryland data centers — 8 tracked projects, 5.3 GW pipeline
- Indiana data centers — 11 tracked projects, 5.0 GW pipeline
- Kansas data centers — 10 tracked projects, 4.5 GW pipeline
- Arizona data centers — 24 tracked projects, 4.4 GW pipeline
- Oklahoma data centers — 12 tracked projects, 4.2 GW pipeline
- North Carolina data centers — 15 tracked projects, 4.1 GW pipeline
- Alabama data centers — 9 tracked projects, 3.4 GW pipeline
- Nebraska data centers — 7 tracked projects, 3.1 GW pipeline
- Michigan data centers — 9 tracked projects, 2.6 GW pipeline
- Arkansas data centers — 7 tracked projects, 2.5 GW pipeline
- Oregon data centers — 13 tracked projects, 2.5 GW pipeline
- New York data centers — 7 tracked projects, 2.3 GW pipeline
- South Carolina data centers — 8 tracked projects, 1.9 GW pipeline
- Missouri data centers — 6 tracked projects, 1.7 GW pipeline
- Nevada data centers — 10 tracked projects, 1.6 GW pipeline
- Wisconsin data centers — 4 tracked projects, 1.5 GW pipeline
- California data centers — 15 tracked projects, 1.4 GW pipeline
- North Dakota data centers — 4 tracked projects, 1.4 GW pipeline
- Iowa data centers — 8 tracked projects, 1.4 GW pipeline
- Delaware data centers — 1 tracked project, 1.2 GW pipeline
- Montana data centers — 2 tracked projects, 1.1 GW pipeline
- Washington data centers — 5 tracked projects, 1.0 GW pipeline
- Colorado data centers — 4 tracked projects, 800 MW pipeline
- Mississippi data centers — 7 tracked projects, 616 MW pipeline
- Minnesota data centers — 4 tracked projects, 600 MW pipeline
- New Jersey data centers — 3 tracked projects, 550 MW pipeline
- South Dakota data centers — 2 tracked projects, 500 MW pipeline
- Massachusetts data centers — 1 tracked project, 274 MW pipeline
- Idaho data centers — 3 tracked projects, 240 MW pipeline
- Tennessee data centers — 7 tracked projects, 110 MW pipeline
- Connecticut data centers — 1 tracked project, 100 MW pipeline
- New Mexico data centers — 2 tracked projects