Arista Networks (ANET)
#1 hyperscaler cloud networking supplier. 400G/800G switches for AI back-end fabrics. Meta and Microsoft top customers.
- Ticker: ANET
- Sector: networking (cloud networking)
- DC exposure tier: high
Arista Networks (ANET) is a high-exposure name in the data-center supply chain in the networking sector. Data Center Index tracks Arista Networks's capex history, project wins, and supplier exposure across the AI infrastructure buildout, refreshed daily from SEC filings and project announcements.
Arista Networks data center thesis
Arista is the merchant-silicon switching standard for hyperscaler AI back-end fabrics: 400G today, 800G shipping, 1.6T in qualification, running EOS across Meta and Microsoft's east-west GPU traffic. Revenue scaled from $2.3B (2020) to $9.0B (2025) at a near-best-in-class 64% gross margin; operating income hit $3.86B. Stock is -18% on the week and +64% YoY because investors are stress-testing hyperscaler concentration after a soft commentary print.
Bull case
- Operating income compounded from $0.7B (2020) to $3.86B (2025) on stable 64% gross margins; Arista keeps software-style economics on hardware because EOS plus merchant silicon scales without proportional headcount.
- AI back-end fabrics need lossless, deterministic east-west bandwidth at GPU-cluster scale; Arista's Etherlink architecture is positioned as the open-Ethernet alternative to InfiniBand and ships in front of B200 cluster buildouts at hyperscaler customers.
- Each generation of GPU (H100 -> B200 -> B300) doubles east-west bandwidth needs and forces a 400G -> 800G -> 1.6T port refresh; Arista's R-series and 7800R4 win the high-end ports inside that compulsory upgrade cycle.
Bear case
- Hyperscaler concentration is the structural risk: Meta and Microsoft are >35% of revenue. Either pulling forward AI capex into 1H or shifting back-end traffic to NVIDIA InfiniBand or in-house silicon resets the multiple sharply.
- Cisco re-entered the merchant-silicon AI-fabric conversation with Silicon One and is bidding hyperscaler tenders aggressively; white-box (Celestica, Wiwynn) eats the long tail at price points Arista won't match.
- Stock at 60% of 52-week high after a -18% week; the 64% gross margin is the multiple. Any commentary suggesting price pressure or share loss in 800G qualification compresses the entire valuation framework.
Data center exposure rationale
Cloud and AI back-end switching for hyperscalers; cloud titans are the largest customer concentration disclosed in the 10-K.
Arista Networks revenue and capex
In fiscal 2025, Arista Networks reported revenue of $9.0B, capital spending of $119.5M and operating income of $3.9B.
| Fiscal year | Revenue | Capex | Operating income |
|---|---|---|---|
| 2025 | $9.0B | $119.5M | $3.9B |
| 2024 | $7.0B | $32.0M | $2.9B |
| 2023 | $5.9B | $34.4M | $2.3B |
Tracked Arista Networks data center projects
- Meta Hyperion, 5 GW, Holly Ridge, LA · under construction
- OpenAI Stargate Abilene, 1.2 GW, Abilene, TX · operational
- Meta Prometheus, 1 GW, New Albany, OH · operational
- Azure Northern Virginia, 1 GW est., Northern Virginia, VA · operational
- Microsoft Fairwater Wisconsin, Mount Pleasant, WI · operational