Kansas Data Centers
Live tracking of every data center project in Kansas (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.
- Operating: 0
- Under construction: 1
- Announced: 10
- Pipeline capacity: 6.7 GW
Data Center Index tracks 11 named data center campuses in Kansas (large sites with a source, not every building): 0 operating, 1 under construction, and 10 announced or permitted. The pipeline adds up to 6.7 GW of planned capacity. Below: every tracked project in Kansas, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Kansas
- Beale Infrastructure Project Pilot (De Soto), De Soto · under construction · developer: Beale Infrastructure · ~$3.1B
- Beltline Energy Pottawatomie County Campus (Jeffrey Energy Center), 1.2 GW, St. Marys · announced · developer: Beltline Energy · ~$15B
- Red Wolf DCD Properties Campus (Kansas Speedway), 600 MW, Kansas City · announced · developer: Red Wolf DCD Properties LLC · ~$12.6B
- Cloverleaf Project Bluestem (Tonganoxie), 1.2 GW, Tonganoxie · announced · developer: Cloverleaf Infrastructure
- Alcove Development Project Catalyst (Osawatomie), 500 MW, Osawatomie · announced · developer: Alcove Development
- PowerTransitions Project Yardbird (Quindaro), 200 MW, Kansas City · announced · developer: PowerTransitions
- Compass Datacenters Shawnee County (Topeka), Topeka · announced · developer: Compass Datacenters
- DAMAC Digital Edgerton (Logistics Park Kansas City), Edgerton · permitted · developer: DAMAC Digital · ~$0.9B
- Digital Realty De Soto Campus (Astra Enterprise Park), 2 GW, De Soto · permitted · developer: Digital Realty
- Flint Hills Digital Campus (Emporia), 1 GW, Emporia · permitted · developer: Kanza Park Place LLC
- Google Project Helium (Barber County), Sharon · permitted · developer: Google
Frequently asked questions
- How many data centers are in Kansas?
- Data Center Index tracks 11 named data center campuses in Kansas as of 2026: 0 operating, 1 under construction, and 10 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Kansas have?
- No operating capacity is published, with 6.7 GW in the announced and under-construction pipeline. Of the 7 Kansas campuses with a capacity figure, 0 are filed, 3 stated and 4 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
- What is the largest data center in Kansas?
- Digital Realty De Soto Campus (Astra Enterprise Park) in De Soto is the largest tracked campus in Kansas at 2 GW, developed by Digital Realty. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building data centers in Kansas?
- Developers with a tracked campus in Kansas include Beale Infrastructure, Beltline Energy, Red Wolf DCD Properties LLC. Every campus page lists its developer, tenant and the source that names them.
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers, 107 tracked projects, 41.4 GW pipeline
- Utah data centers, 8 tracked projects, 13.8 GW pipeline
- Virginia data centers, 94 tracked projects, 13.6 GW pipeline
- Ohio data centers, 37 tracked projects, 12.2 GW pipeline
- Georgia data centers, 43 tracked projects, 9.7 GW pipeline
- Kentucky data centers, 8 tracked projects, 8.3 GW pipeline
- Pennsylvania data centers, 17 tracked projects, 8.3 GW pipeline
- Illinois data centers, 15 tracked projects, 6.2 GW pipeline
- Florida data centers, 6 tracked projects, 5.6 GW pipeline
- Louisiana data centers, 8 tracked projects, 5.5 GW pipeline
- Wyoming data centers, 8 tracked projects, 5.1 GW pipeline
- Oklahoma data centers, 13 tracked projects, 4.5 GW pipeline
- Missouri data centers, 10 tracked projects, 4 GW pipeline
- Alabama data centers, 10 tracked projects, 3.8 GW pipeline
- Arizona data centers, 27 tracked projects, 3.7 GW pipeline
- Maryland data centers, 6 tracked projects, 3.2 GW pipeline
- West Virginia data centers, 8 tracked projects, 2.9 GW pipeline
- North Carolina data centers, 16 tracked projects, 2.3 GW pipeline
- North Dakota data centers, 9 tracked projects, 2.2 GW pipeline
- Michigan data centers, 11 tracked projects, 2.2 GW pipeline
- Arkansas data centers, 7 tracked projects, 1.9 GW pipeline
- Nevada data centers, 12 tracked projects, 1.8 GW pipeline
- South Carolina data centers, 8 tracked projects, 1.5 GW pipeline
- Indiana data centers, 12 tracked projects, 1.5 GW pipeline
- Oregon data centers, 14 tracked projects, 1.4 GW pipeline
- California data centers, 12 tracked projects, 1.3 GW pipeline
- New Mexico data centers, 3 tracked projects, 1.3 GW pipeline
- New York data centers, 4 tracked projects, 1.2 GW pipeline
- Colorado data centers, 5 tracked projects, 1.1 GW pipeline
- Wisconsin data centers, 5 tracked projects, 1.1 GW pipeline
- Montana data centers, 2 tracked projects, 1.1 GW pipeline
- Idaho data centers, 4 tracked projects, 840 MW pipeline
- New Jersey data centers, 3 tracked projects, 550 MW pipeline
- Mississippi data centers, 7 tracked projects, 500 MW pipeline
- South Dakota data centers, 2 tracked projects, 500 MW pipeline
- Nebraska data centers, 7 tracked projects, 403 MW pipeline
- Massachusetts data centers, 1 tracked project, 274 MW pipeline
- Iowa data centers, 9 tracked projects, 200 MW pipeline
- Minnesota data centers, 6 tracked projects, 178 MW pipeline
- Connecticut data centers, 1 tracked project, 100 MW pipeline
- Tennessee data centers, 8 tracked projects, 10 MW pipeline
- Maine data centers, 1 tracked project
- Washington data centers, 5 tracked projects