Alcove Development Project Catalyst (Osawatomie)
500 MW AI data center in Osawatomie, KS, United States — announced.
- Capacity: 500 MW
- Location: Osawatomie, KS, United States
- Developer: Alcove Development
- Status: announced
Alcove Development Project Catalyst (Osawatomie) is a 500 MW AI data center project located in Osawatomie, KS, United States, currently announced. It is being built by Alcove Development. This project is one of thousands of data-center facilities tracked by Data Center Index across KS, United States — covering operational, under-construction, announced, and permitted sites.
Project description
City of Osawatomie and Alcove Development announced plans to move forward with Project Catalyst, a 500+ MW data center campus on a 283-acre site within city limits; development framework being finalized; projected $30M/yr to the city at full build-out.
Related data center projects
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction
- DCIP Group DeSoto County AI Data Center Campus — 4.0 GW, Arcadia, FL, United States · permitted